Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />i <br />1 <br />1 <br />1 <br />1 <br />i <br />SECTION 02200 <br />EARTHWORK <br />PART 1 - GENERAL <br />1.01 RELATED SECTIONS <br />A. Section 01015: General Requirements <br />1.02 SECTION INCLUDES <br />A. Preparation of subgrade for building slabs, walks, and pavements. <br />B. Excavation, fill, and backfill. <br />1.03 QUALITY ASSURANCE <br />A. Perform excavation work in compliance with applicable requirements of <br />governing authorities having jurisdiction. <br />1.04 PROJECT CONDITIONS <br />A. Locate existing underground utilities in areas of work. Provide adequate <br />means of support and protection during earthwork operations. <br />B. Should uncharted, or incorrectly charted, piping or other utilities be <br />encountered during excavation, consult utility owner immediately for <br />directions. Cooperate with Owner and utility companies in keeping <br />respective services and facilities in operation. Repair damaged utilities to <br />satisfaction of utility owner. <br />C. Do not interrupt existing utilities serving occupied facilities <br />D. Use of Explosives: If the use of explosives is necessary for the execution <br />of the work the Contractor shall conduct his blasting operations in <br />conformance with these specifications and all applicable state and local <br />codes and regulations. <br />E. Protect structures, utilities, sidewalks, pavements, and other facilities from <br />damage caused by settlement, lateral movement, undermining, washout <br />and other hazards created by earthwork operations. <br />December 2006 <br />02200 -1 <br />06 -5723 <br />