My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Where the limits of Special Clearing and Grubbing are shown on the <br />Plans or otherwise established in the Contract Documents but no <br />separate pay item established, the measurement of such work shall be <br />included in the quantity or lump sum amount of "Clearingand Grubbing ". <br />E. Eradication of Exotic Vegetation: Measurement of Eradication of Exotic <br />Vegetation shall include areas shown on the Plans or designated in the <br />field by the Owner's representative. <br />This measurement shall include the total area within the limits established <br />for Eradication of Exotic Vegetation and include the areas within these <br />limits where non - exotic vegetation is removed. Where the Owner's <br />representative has designated desirable vegetation to remain within these <br />limits, no deduction of area shall be made for the "saved" areas. <br />Where limits of Eradication of Exotic Vegetation area shown on the Plans <br />or otherwise established in the Contract Documents but no separate pay <br />item established, the measurement of such work shall be included in the <br />' quantity or lump sum amount of "Clearing and Grubbing ". <br />F. Removal of Existing Pavement: When a separate pay item is established <br />for the Removal of Existing Pavement, the quantity to be paid shall be by <br />the square yard for the actual quantity removed and disposed of off -site. <br />3.11 BASIS FOR PAYMENT <br />A. General: Prices and payments for the various work items included in this <br />Section shall constitute full compensation for all work described herein <br />and shall include all removal, disposal, protecting, trimming, breaking, <br />plugging, eradication, or any other items specified in this Section. <br />B. Pay Items: For all work specified in this Section, payment shall be made <br />in accordance with the list of pay items established or as otherwise <br />defined in the Contract Documents. The description of a pay item in the <br />proposal section may vary from the descriptions stated in this Section. <br />END OF SECTION <br />December 2006 02817 -5 06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.