My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.03 FIELD TESTS <br />A. Sets of four field control cylinder specimens will be taken at random by the <br />Engineer during the progress of the work, in conformity with ASTM <br />Designation C31; the total number of specimens taken on the project may <br />average one set per 150 cu yds, and in general not less than one set of <br />specimens will be taken on any one day when concrete is being placed. <br />When average ultimate 28 -day strength of control cylinders in any set falls <br />below the required ultimate strength or below proportional minimum 7 <br />day strengths where proper relation between 7 and 28 day strengths <br />have been established by tests, proportions, water content, or <br />temperature conditions shall be changed to secure the required strength. <br />B. The Contractor shall cooperate in the making of such tests to the extent of <br />allowing free access to the work for the selection of samples, providing <br />heated (when required) moist storage facilities for specimens, affording <br />protection to the specimens against injury or loss through his operations, <br />and furnishing material and labor required for the purpose of taking <br />concrete cylinder samples, curing boxes and shipping boxes. All shipping <br />of specimens will be paid for by the Owner. <br />C. Slump tests will be made in the field by the testing laboratory. <br />3.04 INSPECTION AND CONTROL <br />A. The preparation of forms, placing of reinforcing steel, conduits, pipes, and <br />sleeves, batching, mixing, transportation, placing and curing of concrete <br />shall be at all times under the inspection of the Engineer. <br />B. The Contractor shall engage the services of an approved testing <br />laboratory to establish the basic mixtures of concrete as required by the <br />specifications. <br />C. The Owner will engage the services of a testing laboratory to test field <br />control cylinder specimens and to conduct other tests as specified herein <br />or as deemed required by the Engineer to insure the quality. <br />D. Air entrainment shall be measured by the testing laboratory or his <br />representative at time of concrete deposit in accordance with ASTM <br />Designation C231. <br />3.05 CONCRETE APPEARANCE <br />ki <br />Concrete for every part of the work shall be homogeneous structure <br />which, when hardened, will have the required strength, durability and <br />appearance. <br />December 2006 03300 -9 06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.