My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />H. Before form material is re -used, all surfaces in contact with concrete shall <br />be thoroughly cleaned, all damaged places repaired, all projecting nails <br />withdrawn, all protrusions smoothed and in the case of wood forms <br />t pre - oiled. <br />Form ties encased in concrete shall be designed so that after removal of <br />the projecting part, no metal shall be within 1 -inch of the face of the <br />concrete. That part of the tie to be removed shall be at least 1/2 -inch <br />diameter or be provided with a wood or metal cone at lease 1/2 -inch in <br />diameter and 1 -inch long. Form ties in concrete exposed to view shall be <br />the cone - washer type equal to the Richmond "Tyscru ". Throughbolts or <br />common wire shall not be used for form ties. <br />3.07 PLACING AND COMPACTING <br />A. Unless otherwise permitted, the work begun on any day shall be <br />completed in daylight of the same day. <br />B. Concrete is not to be placed until reinforcing steel, pipes, conduits, <br />sleeves, hangers, anchors and other work required to be built into <br />concrete have been inspected and approved by the Engineer. Remove <br />water and foreign matter from forms and excavation. All soil bottom for <br />slabs and footings shall be approved by the Engineer before placing <br />concrete. <br />C. Transport concrete from mixer to place of final deposit as rapidly as <br />practicable by methods which prevent separation of ingredients and <br />displacement of reinforcement, and which avoid rehandling. Partially <br />hardened concrete is not to be used. <br />D. "Cold joints" are to be avoided, but if they occur, are to be treated as <br />bonded construction joints. <br />E. At construction joints the surfaces of the concrete already placed, <br />including vertical and inclined surfaces, shall be thoroughly cleaned of <br />foreign materials and laitance, and weak concrete and roughened with <br />suitable tools to expose a fresh face. At least two hours before and again <br />shortly before the new concrete is deposited, the joints shall be saturated <br />with water. After glistening water disappears, the joints shall be given a <br />thorough coating of neat cement slurry mixed to the consistency of very <br />heavy paste. The surfaces shall receive a coating at least 1/8 -inch thick, <br />well scrubbed -in by means of stiff bristle brushes whenever possible. <br />New concrete shall be deposited before the neat cement dries. <br />F. Deposit concrete to maintain, until the completion of the unit, a horizontal <br />plastic surface. Vertical lifts shall not exceed 24- inches and preferably <br />18- inches. <br />December 2006 03300 -11 06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.