My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� I <br />� I <br />J <br />These General Conditions have been prepared for use with the Suggested Forms of Agreement Between Owner and <br />Contractor Nos. C -520 or C -525 (2002 Editions). Their provisions are interrelated and a change in one may necessitate a <br />change in the other. Comments concerning their usage are contained in the EJCDC Construction Documents, General and <br />Instructions (No. C -001) (2002 Edition). For guidance in the preparation of Supplementary Conditions, see Guide to the <br />Preparation of Supplementary Conditions (No. C -800) (2002 Edition). <br />EJCDC C -700 Standard General Conditions of the Construction Contract. <br />Copyright CD 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700-2 <br />IDecember 2006 06 -5723 <br />Copyright 02002 <br />National Society of Professional Engineers <br />1420 King Street, Alexandria, VA 22314 <br />American Council of Engineering Companies <br />1015 15th Street, N. W., Washington, DC 20005 <br />American Society of Civil Engineers <br />1801 Alexander Bell Drive, Reston, VA 20191 -4400 <br />J <br />These General Conditions have been prepared for use with the Suggested Forms of Agreement Between Owner and <br />Contractor Nos. C -520 or C -525 (2002 Editions). Their provisions are interrelated and a change in one may necessitate a <br />change in the other. Comments concerning their usage are contained in the EJCDC Construction Documents, General and <br />Instructions (No. C -001) (2002 Edition). For guidance in the preparation of Supplementary Conditions, see Guide to the <br />Preparation of Supplementary Conditions (No. C -800) (2002 Edition). <br />EJCDC C -700 Standard General Conditions of the Construction Contract. <br />Copyright CD 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700-2 <br />IDecember 2006 06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.