Laserfiche WebLink
17. Park 12" Light Fixtures <br />6 EA <br />18. Canopy Light <br />I EA _ <br />B Electrical Materials <br />19. Sch 40 PVC Conduit and Fittings, to include <br />trenching, backfill, and restoration to existing <br />or improved conditions. <br />2810 LF <br />20. Copper Wiring <br />2810 LF <br />21. Panel Board <br />I EA <br />22. Lighting Contactor <br />3 EA <br />23. Time Clock <br />2 EA <br />SUBTOTAL ELECTRICAL <br />IV. Building <br />24. Proposed Prefabricated Restroom and Office <br />building (complete) including all labor, <br />equipment and materials necessary for final <br />product. Complete building to include, but not <br />be limited to stone walk around building, all <br />structural, plumbing, mechanical, electrical, <br />finishing work, communication system, <br />furniture, all building finishes, excavation, fill <br />and preparation of building pad as indicated in <br />plans <br />1 LS <br />25. Final Restoration around building to include, <br />but not limited to sodding, and irrigation. <br />I LS <br />SUBTOTAL BUILDING <br />V. Contingency <br />1 LS <br />TOTAL BASE BID (Item I Thru V) <br />(Written) <br />(Authorized Signature) <br />$25,000.00 <br />$ <br />$ <br />$25,000.00 <br />( Date) <br />December 2006 00300 -3 06 -5723 <br />