Laserfiche WebLink
01/19/2007 15:22 9549211496 CGA PAGE 05 <br />17. Park 12" Light Fixtures <br />2 <br />18. Canopy Light <br />B Electrical Materials <br />19_ Selz 40 PVC Conduit and Fittings, to include <br />trenching, backfill, and restoration to existing <br />or improved conditions. 2810 <br />20. Copper Wiring <br />281.0 <br />21. Panel Board <br />1 <br />22. Lighting Contactor <br />23. Time Clock <br />SUBTOTAL ELECTRICAL <br />IV. Building <br />24. Proposed Prefabricated Restroom and Office <br />building (complete) including all labor, <br />equipment and materials necessary for final <br />product_ Complete building to include, but not <br />be Limited to stone walk around building, all <br />structural, plumbing, mechanical, electrical, <br />finishing work, communication system. <br />furniture, all building finishes, excavation, fill <br />and preparation of building pad as indicated in <br />plans <br />25. Final Restoration around building to include, <br />but not limited to sodding, and irrigation_ <br />SUBTOTAL BUILDING <br />V. Contingency <br />TOTAL BASE BID (Item I Thru V) <br />3 <br />E <br />1 <br />1 <br />EA <br />5W °E, <br />ra <br />,5Dc c <br />LF F 00 2-2, —I FO a c <br />LF 1.50 <br />pQ. <br />EA D ` 0 1? 000 pc7 _j) <br />EA 1j00000 <br />eV �Ll <br />EA QQ 00o <br />-T <br />LS 066 <br />LS 4, OUD� <br />l�l &q5 0 <br />-15,000" <br />, 0QQ " <br />0 a <br />00 z <br />W G <br />-7q, <br />DD <br />LS $25,000.00 $25,000.00 <br />UAbLJaLU1G) <br />�i ur <br />i Ll -)rvn7 <br />(Date) <br />December 2006 00300 -3 06 -5723 <br />