Laserfiche WebLink
i <br />N� <br />f/ <br />N � <br />roject <br />DA designed the expansion and modification of the existing water distribution and <br />astewater collection facilities for the City of Weston. <br />ie design process involved using computer modeling programs to calculate current and <br />ture flow rates. The facilities include over 120,000 linear feet of 10 -inch through 24 -inch <br />ater transmission mains. Additionally, the project includes modifications to more than 30 <br />:isting lift stations, the addition of 35 new lift stations, and approximately 97,000 linear <br />et of force mains. A SCADA system was installed, which will aid in monitoring the new lift <br />ations. <br />aA also assisted the City with financial assistance for this project: A $23 -M bond issue <br />as obtained. <br />Client <br />City of Weston <br />Contact information <br />at time of project: <br />John Flint, City Manager <br />2500 Weston Road, <br />Suite 101 <br />Weston, Florida 33331 <br />I 954 385 2000 <br />Project Date <br />1996 to the present <br />Es. timated Construction <br />Cost <br />$5,700,000 <br />Key Personnel <br />Karl Kennedy, PE <br />