• Calvin, Giordano Associates,
<br />SUMMARY OF QUALIFICATIONS EDUCATION
<br />Mr. Krawczyk has 8 years of engineering design experience that has focused primarily on B.S. Chemical
<br />water - related projects. His experience includes sewer, stormwater drainage, and swale Engineering,
<br />design and installation. He is also well versed in the design of roadway and parking University of Florida
<br />structures. Mr. Krawczyk is familiar with agency permitting and inspections as they relate to
<br />water and roadway projects. He is adept at using AUTOCAD 2002, Cascade Water Quality
<br />Calculation Program, Haestad WaterCAD Modeling, ArcView GIS, Fortran 77, Matlab, PROFESSIONAL
<br />MSAccess, Power Point, PASCAL, and Excel in both design and construction phases of REGISTRATION
<br />these projects.
<br />Engineer Intern,
<br />PROJECT EXPERIENCE State of Florida
<br />Gulfstream Park Project Phases III, Site Engineer. From 2003 to the present, Mr.
<br />Krawczyk has provided site engineering services for this project. Responsibilities include:
<br />• Supervised all site construction activities
<br />• Coordinated company work crews and subcontractors
<br />• Redesigned sanitary sewer system, structures and pipe material
<br />• Permitted for surface water, sewer transmissions, biological resource, and BCHD
<br />• Inspection reporting
<br />• Completed permit closeouts
<br />Gulfstream Park Project, Phases I and II, Team Engineer.
<br />• Assisted in design of sanitary sewer system, drainage, and water main
<br />• Assisted in design of AirVac Vacuum sewer system
<br />• Assisted in permitting of surface water, sewer transmission, biological resource, and
<br />BCHD
<br />• Coordinated company work crews and subcontractors
<br />• Inspection reporting
<br />• Completed permit closeouts
<br />Ferrous Processing and Trading. As Project Estimator and Project Manager, Mr.
<br />Krawczyk managed field crews, drafted bid proposals, subcontractor /supplier agreements,
<br />and construction pay requests, and value engineered drainage system.
<br />City of Plantation Directional Drill Project. As Design Engineer, Mr. Krawczyk managed
<br />survey work and field investigations, designed three (3) directional drills - 30 FM, 10 WM,
<br />and 8 WM. He completed the permitting for FDOT, SFWMD, ROW, BCHD, and BCEPD
<br />Transmission.
<br />Hollywood 30th Avenue Force Main Project, City of Hollywood, Florida.
<br />Construction Manager responsible for construction of force main and gravity sewer system.
<br />Vista Park, City of Weston, Florida. Design Engineer assisting in construction
<br />management of city park project.
<br />NE 122nd Street Neighborhood Improvement Project, City of North Miami Beach,
<br />Florida. Mr. Krawczyk performed planning, design, and permitting for construction of
<br />drainage, parking, and roadway reconstruction.