Laserfiche WebLink
• Calvin, Giordano Associates, <br />SUMMARY OF QUALIFICATIONS EDUCATION <br />Mr. Krawczyk has 8 years of engineering design experience that has focused primarily on B.S. Chemical <br />water - related projects. His experience includes sewer, stormwater drainage, and swale Engineering, <br />design and installation. He is also well versed in the design of roadway and parking University of Florida <br />structures. Mr. Krawczyk is familiar with agency permitting and inspections as they relate to <br />water and roadway projects. He is adept at using AUTOCAD 2002, Cascade Water Quality <br />Calculation Program, Haestad WaterCAD Modeling, ArcView GIS, Fortran 77, Matlab, PROFESSIONAL <br />MSAccess, Power Point, PASCAL, and Excel in both design and construction phases of REGISTRATION <br />these projects. <br />Engineer Intern, <br />PROJECT EXPERIENCE State of Florida <br />Gulfstream Park Project Phases III, Site Engineer. From 2003 to the present, Mr. <br />Krawczyk has provided site engineering services for this project. Responsibilities include: <br />• Supervised all site construction activities <br />• Coordinated company work crews and subcontractors <br />• Redesigned sanitary sewer system, structures and pipe material <br />• Permitted for surface water, sewer transmissions, biological resource, and BCHD <br />• Inspection reporting <br />• Completed permit closeouts <br />Gulfstream Park Project, Phases I and II, Team Engineer. <br />• Assisted in design of sanitary sewer system, drainage, and water main <br />• Assisted in design of AirVac Vacuum sewer system <br />• Assisted in permitting of surface water, sewer transmission, biological resource, and <br />BCHD <br />• Coordinated company work crews and subcontractors <br />• Inspection reporting <br />• Completed permit closeouts <br />Ferrous Processing and Trading. As Project Estimator and Project Manager, Mr. <br />Krawczyk managed field crews, drafted bid proposals, subcontractor /supplier agreements, <br />and construction pay requests, and value engineered drainage system. <br />City of Plantation Directional Drill Project. As Design Engineer, Mr. Krawczyk managed <br />survey work and field investigations, designed three (3) directional drills - 30 FM, 10 WM, <br />and 8 WM. He completed the permitting for FDOT, SFWMD, ROW, BCHD, and BCEPD <br />Transmission. <br />Hollywood 30th Avenue Force Main Project, City of Hollywood, Florida. <br />Construction Manager responsible for construction of force main and gravity sewer system. <br />Vista Park, City of Weston, Florida. Design Engineer assisting in construction <br />management of city park project. <br />NE 122nd Street Neighborhood Improvement Project, City of North Miami Beach, <br />Florida. Mr. Krawczyk performed planning, design, and permitting for construction of <br />drainage, parking, and roadway reconstruction. <br />