Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />Summary Minutes <br />RFQ No. 07-03-01 <br />Engineering Consultant - Pedestrian Bridge, Town Center Park, etc. <br />Mandatory Pre-Bid Meeting <br />April 10, 2007 at 10:00a.m., 4th floor Conference Room <br />(Note: The bid opening date has been ~oned until AI!!:!! <br />2Sll\ 2007 at 10:00a.ln.) <br /> <br />1. CALL TO ORDER <br /> <br />The meeting was called to order at 10:00a.m. Rick Conner, Public Works Director, <br />introduced himself and distributed an aerial photograph of the area with the proposed <br />facilities shown on it (titled: "Fund I: Parks Impact Fees", page 220 of Comprehensive Plan <br />or LDRs). <br /> <br />2. <br /> <br />DISCUSSION <br /> <br />EmerJ!encv & Pedestrian BridJ!e <br />Rick Conner displayed a photograph displaying where the Emergency and Pedestrian Bridge, <br />that will connect N, Bay Road from 174111 Street to 172nd Street, will be located. A walkway <br />will connect Town Center Park down to the Pedestrian Bridge (where there will be an <br />observation deck). The City wants a design of bridge that will connect North Bay Road <br />through. At this point, Collins is the only way to get from the north-end of the city to the <br />south-end of the city. Another parallel emergency route is needed in case there is an accident <br />or other emergency, A fire station is located on 172nd Street. We currently have a 20' <br />pedestrian easement offset through there, The building that currently exists there abuts an <br />casement. An alignment must be made on the western side, It is believed that at some point <br />the abutting building will be renovated and rebuilt. All we have is the 20' easement and so <br />the alignment must be made on the west side. At this time we want a very elaborate <br />pedestrian bridge sllch that if and when we obtain (and if the Commission desires) the <br />additional access needed, we can turn it into a full-fledged vehicular bridge with really nice <br />pedestrian facilities, <br /> <br />Boardwalk <br />The second part project is a boardwalk that will connect to the Town Center Park. <br />Originally, these two were going to be separate projects. We are combining the designs to <br />ensure good connectivity, That is the overall bulk and content. <br />