Laserfiche WebLink
<br />I <br />I <br />I <br /> <br />4. Project Schedule and Cost Estimated <br /> <br />I <br />I <br />I <br />I <br /> <br />4.1. Schedule. <br />We have estimated a duration of 840 days from Notice to Proceed to completion <br />of the project, allowing sufficient time for City's approval of the conceptual <br />design and final contract documents. For breakdown of the various activities see <br />schedule attachment. <br /> <br />4.2. Construction Cost <br />The estimate of probable construction cost of the bridge range between $2 <br />Millions to $2.5 Millions. <br />The estimate of probable construction cost for the boardwalk range between <br />$900,000 to $950,000 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />4.3. Man hour's requirements <br />We have estimated that the alternative analysis, conceptual design, final design <br />and post design services for the bridge and boardwalk will require 2,500 hours. <br /> <br />5. Why Berger A vart, Inc. <br /> <br />5.1. Project Management. <br />Berger Avart, Inc. has developed a uniquely qualified team specifically in <br />response to address the project issues stated in your RFP. This will assure that all <br />disciplines are fully covered with sufficient flexibility and depth to respond to any <br />scheduling. Our team of professionals is able to offer the City a comprehensive <br />staff with outstanding credentials, coupled with the right mix of support staff to <br />this important effort. <br /> <br />Berger A vart, Inc. is ready to assist the City with these and other issues, and can <br />provide required engineering design and construction administration services for <br />the City. We understand the concerns and requirements of our clients, which has <br />led to streamlining our process for increased efficiency and improve response <br />time. This type of response is imperative to maintain the budget and schedule. <br /> <br />Our mission is to provide our clients with professional, seamless service while <br />being responsive to their needs and requirements at all times. <br /> <br />As always, I am looking forward to establish and maintain a long successful <br />relationship with the City. <br /> <br />I <br />I <br />I <br /> <br /> <br />T:IMARKETINGIPROPOSALSIMARKETING.0710724 pedestrian bridgelDoclPedestrian Bridge and boardwalk,doc <br /> <br />Page 8 of 9 <br />