My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berger Avart Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-03-01) General Engineering Services
>
Responses
>
Berger Avart Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 3:44:45 PM
Creation date
1/26/2011 3:44:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Engineering Svcs
Bid No. (xx-xx-xx)
07-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br /> <br />4. Project Schedule and Cost Estimated <br /> <br />I <br />I <br />I <br />I <br /> <br />4.1. Schedule. <br />We have estimated a duration of 840 days from Notice to Proceed to completion <br />of the project, allowing sufficient time for City's approval of the conceptual <br />design and final contract documents. For breakdown of the various activities see <br />schedule attachment. <br /> <br />4.2. Construction Cost <br />The estimate of probable construction cost of the bridge range between $2 <br />Millions to $2.5 Millions. <br />The estimate of probable construction cost for the boardwalk range between <br />$900,000 to $950,000 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />4.3. Man hour's requirements <br />We have estimated that the alternative analysis, conceptual design, final design <br />and post design services for the bridge and boardwalk will require 2,500 hours. <br /> <br />5. Why Berger A vart, Inc. <br /> <br />5.1. Project Management. <br />Berger Avart, Inc. has developed a uniquely qualified team specifically in <br />response to address the project issues stated in your RFP. This will assure that all <br />disciplines are fully covered with sufficient flexibility and depth to respond to any <br />scheduling. Our team of professionals is able to offer the City a comprehensive <br />staff with outstanding credentials, coupled with the right mix of support staff to <br />this important effort. <br /> <br />Berger A vart, Inc. is ready to assist the City with these and other issues, and can <br />provide required engineering design and construction administration services for <br />the City. We understand the concerns and requirements of our clients, which has <br />led to streamlining our process for increased efficiency and improve response <br />time. This type of response is imperative to maintain the budget and schedule. <br /> <br />Our mission is to provide our clients with professional, seamless service while <br />being responsive to their needs and requirements at all times. <br /> <br />As always, I am looking forward to establish and maintain a long successful <br />relationship with the City. <br /> <br />I <br />I <br />I <br /> <br /> <br />T:IMARKETINGIPROPOSALSIMARKETING.0710724 pedestrian bridgelDoclPedestrian Bridge and boardwalk,doc <br /> <br />Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.