My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2011-1672
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2011
>
Reso 2011-1672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2013 2:29:45 PM
Creation date
1/27/2011 10:14:28 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2011-1672
Date (mm/dd/yyyy)
01/20/2011
Description
1st Amd to Agmt w/Tally Engineering, Add’l Inspection Srvs: Heritage Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HERITAGE PARK AND PARKING GARAGE <br />CITY OF SUNNY ISLES BEACH <br />MIAMI-DADE COUNTY, FLORIDA <br /> <br />July 31. 20M <br />RFQ-NO 09-03-01 <br />(Revision) <br /> <br />SCOPE OF SERVICES <br /> <br />A. FOVNDA T/ON INSPECTION <br /> <br />. Provide Engineering Technician at the job site to perform foundation inspections to <br />monitor the installatiol1 of the auger-cast piles; <br />. Pile location and plumpness; <br />. Ground surface elevation; Pile toe (bottom) depth/elevation; <br />. Pile length; <br />. Auger diameter; <br />. Details of the reinforcing steel (number, size, and grade of longitudinal bars, size and <br />spacing of transverse steel; outside diameter and length of cage); <br />. Flow cone efflux time and volume of grout placed, or slump and volume of concrete <br />placed; <br />. Theoretical volume of excavation (theoretical diameter = diameter of auger); <br />. Depth/Elevation to which reinforcing steel was placed; <br />. Dateffime of beginning of drilling; and completion of drilling; <br />. Dateffime grout was mixed, ready-mix grout truck arrived at project site, and copies <br />of all grout batch tickets used for pile construction; <br />. Dateffime of beginning of grout pumping, completion of grout pumping, and placement of <br />reinforcing steel. <br />. Weather conditions, including air temperature, at time of grout or concrete placement; <br />. Identification of all grout or concrete samples taken from the pile; <br />. Perform one compressive static load test, The testing will be in accordance with ASTM- <br />D1143 standard test loading method and under the direct supervision of licensed <br />Professional Geotechnical Engineer. <br />. Provide a written report by a professional Geotechnical Engineer licensed in the State of <br />Florida, <br /> <br />B. CONSTR VCT/ON MA TERIALS TESTING <br /> <br />1. Concrete <br /> <br />. Engineering technicians at the job site to sample fresh concrete and auger-cast grout. <br />Monitor the air and mix temperature, perform a slump, and air content test, and cast <br />one set of five 6 by 12 inch cylinders per every 50 cubic yards of concrete, <br />. Cure, cap, compressive strength testing and reporting, per cylinder. <br />. Engineering technicians at the job site to pick-up cylinders cast on the previous day. <br /> <br />2. Unit Masonry <br /> <br />. Obtain field samples of mortar, prepare cubes or grout prisms and conduct laboratory <br />compressive strength tests, <br />. Obtain field samples of CMU and conduct laboratory compressive strength tests, <br /> <br />SIB <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.