Laserfiche WebLink
<br />HERITAGE PARK AND PARKING GARAGE <br />CITY OF SUNNY ISLES BEACH <br />MIAMI-DADE COUNTY, FLORIDA <br /> <br />July 31. 20M <br />RFQ-NO 09-03-0 I <br />(Revision) <br /> <br />. Option 2: <br />o Off site constructions manager and part time administrative services. <br />Construction manager will visit everyday as required, secretary filing will be <br />at our office, <br />Estimated cost ...................................,......,......,..,.,......,..,.............,...,.,. $ 95,000 <br /> <br />We estimate that these services are required for the duration of the project based on 360 <br />days, <br /> <br />TOTAL ESTIMATED COST............................................. ............................$ 152,400 <br /> <br />Notes: <br /> <br />1. Overtime is defined as time over 8 hours per day, Saturday and Sunday. and both time and <br />unit pricing will be charged at standard rate x \,10, <br />2, All hourly inspection time will be charged as portal to portal from our office, <br />3, Estimate does not include stand-by time, cancelled activities or re-testing cost. <br />4, Stand-by and cancelled activities time will be charged at the appropriate rate <br /> <br />The total cost of the inspection and construction monitoring services is dependent upon the <br />Contractor's actual schedule and is, therefore, beyond our control. Tally Engineering Inc. will <br />produce an invoice for the actual work performed each month based on the rates il1dicated above, <br /> <br />10 <br /> <br />SIB <br />