Laserfiche WebLink
<br />. <br />. <br />I <br /> <br />tp <br />. <br />. <br />. <br /> <br />I <br />. <br />t <br />. <br />I <br /> <br />. <br />. <br />I <br /> <br />. <br />. <br /> <br />tt <br />tt <br />. <br />. <br />. <br />I <br />. <br />. <br />. <br />. <br />. <br />I <br />. <br />: <br />. <br />. <br />~ <br />. <br />~ <br />I <br />~ <br />. <br />j <br /> <br />. <br />I <br />~ <br />~ <br />. <br />. <br />. <br /> <br />i <br /> <br />~ <br />. <br />. <br />. <br />. <br />. <br /> <br />--~ <br /> <br />LAZARO E. FLEITAS, P .S.M. <br />Right of Way & Design Survey <br /> <br />!':!~!~, <br /> <br />EDUCATION <br /> <br />Alvaro Reynoso Polytechnic Institutel Middle Technician Degree in Topography, 1980 <br />Higher Institute of Agricultural Science of Havana, CUBA I Irrigation and Drainage Engineer Degree, 1989 <br /> <br />REGISTRATION <br />Florida Professional Surveyor and Mapper No. 6518, 2006 <br /> <br />CERTIFICATIONS <br /> <br />GPS <br />CAICE <br />COMP USA (Several computer courses) <br /> <br />WORK HISTORY <br /> <br />Marlin Engineering, Inc., Miami, Florida <br />February 2007 - Present <br />Right of Way & Design Surveyor <br /> <br />SR 809 - Military Trail, Palm Beach, FI <br />Mr. Fleitas is the Survey Project Manager responsible for the direction of all survey activities. This project <br />entails the collection of Topography, DTM, Vertical control verification, reestablish points from control <br />network, GPS. <br /> <br />1-95/SR 9A, Miami, FI <br />Mr. Fleitas is the Survey Project Manager responsible for the direction of all survey activities. This project <br />entails the establishment of aerial targets, vertical control, and horizontal control for a Low Altitude Mapping <br />Photogrammetry (LAMP) survey. <br /> <br />SR 713 - Kings Hwy, St. Lucie, FI <br />Mr. Fleitas is the Survey Project Manager responsible for the direction of all survey activities. This project <br />entails the collection of Topography, DTM, Vertical control verification, reestablish points from control <br />network, GPS, and Project Network Control plan. <br /> <br />Florida Department of Transportation, District 6, Miami, FI <br />January 2005 - February 2007 <br />Professional Land Surveyor Supervisor 11- SES (Assistant Location Surveyor) <br /> <br />The primary duty of this position is support to the District Location Surveyor as his assistant. Manage and <br />monitor Consultants and all agency in house survey crews performing Right of Way and Location Surveying. <br />Approving invoices in accordance with section 215, 422 of the F.S. Supervising the production and <br />attendance of survey crews assuring that all work is in compliance with DOT and minimum technical <br />standards, and that all safety procedures are followed allowing progress of field work to meet production <br />schedules. Data collection to coordinate and review field work, maps, existing baselines, surveys, field <br />books, bench run, etc. Reviews field note to independently QP, QC projects. Custodian of records for future <br />reference. Reviews manpower estimates and adequate use of equipment. Prepares scope of services, <br />contract selection, and advertising for negotiations with consultant contracts. Coordinates technical <br />information required for project completion with consultants schedule to assure department production. <br />Collecting and distributing work for consultants monitoring work load is adequate to finish task in a timely <br />manner. Supervise all GPS (Global Positioning System) work for the District in-house and consultant QAlQC. <br />Supervise data processing and maintain all GPS work. Assist in budget programming, prepare extensions <br />and supplemental agreements, evaluate and grade consultants and prepare letters of authorization. Assist in <br />managing CEI surveys and consultant selection process. Review consultant invoices, authorize payment <br />