My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:47:00 PM
Creation date
1/27/2011 2:45:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
State Road 826/SIBlvd. Project
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />satisfactory to Owner to indemnify Owner against any <br />Lien. <br /> <br />I <br /> <br />B. Engineer's Rel'ie'w of Application and <br /> <br />Acceptance <br /> <br />I <br /> <br />I. If, on the basis of Engineer's observation of <br />the Work during constmction and final inspection, and <br />Engineer's review of the final Application for Payment <br />and accompanying documentation as required by the <br />Contract Documents, Engineer is satisfied that the Work <br />has been completed and Contractor's other obligations <br />under the Contract Documents have been fulfi lled, <br />Engineer will, within ten days after receipt of the final <br />Application for Payment, indicate in writing Engineer's <br />recommendation of payment and present the Application <br />for Payment to Owner for payment. At the same time <br />Engineer will also give written notice to Owner and <br />Contractor that the Work is acceptable subject to the <br />provisions of Paragraph 14.09. Otherwise, Engineer will <br />return the Application for Payment to Contractor, indicat- <br />ing in writing the reasons for refusing to recommend final <br />payment, in which case Conh'actor shall make the <br />necessary corrections and resubmit the Application for <br />Payment. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />C. Payment Becomes Due <br /> <br />I <br /> <br />I. Thirty days after the presentation to Owner of <br />the Application for Payment and accompanying docu- <br />mentation, the amount recommended by Engineer, less <br />any sum Owner is entitled to set off against Engineer's <br />recommendation, including but not limited to liquidated <br />damages, will become due and, will be paid by Owner to <br />Contractor. <br /> <br />I <br /> <br />I <br /> <br />14.08 Final Completion Delayed <br /> <br />I <br /> <br />A. If, tlU'ough no fault of Contractor, final <br />completion of the Work is significantly delayed, and if <br />Engineer so confirms, Owner shall, upon receipt of <br />Contractor's final Application for Payment (for Work <br />fully completed and accepted) and recommendation of <br />Engineer, and without terminating the Contract, make <br />payment of the balance due for that portion of the Work <br />fully completed and accepted. If the remaining balance to <br />be held by Owner for Work not fully completed or <br />corrected is less than the retainage stipulated in the <br />Agreement, and if bonds have been furnished as required <br />in Paragraph 5.0 I, the written consent of the surety to the <br />payment of the balance due for that portion of the Work <br />fully completed and accepted shall be submitted by <br />Contractor to Engineer with the Application for such <br />payment. Such payment shall be made under the terms <br />and conditions governing final payment, except that it <br />shall not constitute a waiver of Claims. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />14.09 Waiver of Claims <br /> <br />I <br /> <br />A. The making and acceptance of final payment <br />will constitute: <br /> <br />I. a waiver of all Claims by Owner against <br />Contractor, except Claims arising from unsettled Liens, <br />from defective Work appearing after final inspection <br />pursuant to Paragraph 14.06, from failure to comply with <br />the Contract Documents or the terms of any special <br />guarantees specified therein, or from Contractor's <br />continuing obligations under the Contract Documents; <br />and <br /> <br />2. a waiver of all Claims by Contractor against <br />Owner other than those previously made in accordance <br />with the requirements herein and expressly acknowledged <br />by Owner in writing as still unsettled. <br /> <br />ARTICLE 15 - SUSPENSION OF WORK AND <br />TERMINATION <br /> <br />15.01 OWI/er May Suspend Work <br /> <br />A. At any time and without cause, Owner may <br />suspend the Work or any portion thereof for a period of <br />not more than 90 consecutive days by notice in writing to <br />Contractor and Engineer which will fix the date on which <br />Work will be resumed. Contractor shall resume the Work <br />on the date so fixed. Contractor shall be granted an adjust- <br />ment in the Contract Price or an extension of the Contract <br />Times, or both, directly attributable to any such <br />suspension if Conh'actor makes a Claim therefor as <br />provided in Paragraph 10.05. <br /> <br />15.02 Owner May Terminate for Cause <br /> <br />A. The occurrence of anyone or more of the <br />following events will justify termination for cause: <br /> <br />I. Contractor's persistent failure to perform the <br />Work in accordance with the Contract Documents <br />(including, but not limited to, failure to supply sufficient <br />skilled workers or suitable materials or equipment or <br />failure to adhere to the Progress Schedule established <br />under Paragraph 2.07 as adjusted from time to time <br />pursuant to Paragraph 6.04); <br /> <br />2. Contractor's disregard of Laws or Regulations <br />of any public body having jurisdiction; <br /> <br />3. Contractor's disregard of the authority of <br />Engineer; or <br /> <br />4. Contractor's violation in any substantial way <br />of any provisions of the Contract Documents. <br /> <br />13. If one or more of the events identified 111 <br />Paragraph 15.02.A occur, Owner may, after giving <br />Contractor (and surety) seven days written notice of its <br />intent to terminate the services of Contractor: <br /> <br />I <br /> <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright <Q 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 39 <br />