Laserfiche WebLink
<br />APR-30-2007 MON 05:00 PM CALVIN GIORDANO <br /> <br />FAX NO. 9549218807 <br /> <br />P. 16/22 <br /> <br />Section 01000 - Supplemental Specifications <br />STATE ROAD 826 I SUNNY ISLES BOULEVARD PROJECT <br />CGA Project No. 03-4122.0 <br />City of Sunny Isles Beach Bid No. 07-03-02 <br /> <br />SUPPLEMENTAL SPECIFICATIONS <br /> <br />102 Maintenance of Traffic <br />104 Prevention, Control and abatement of Erosion and Water Pollution <br />105 Contractor Quality Control General Requirements- Personnel Qualifications <br />110 Removal o'f Exisiting Structures <br />1 20 Excavation and Embankment <br />125 Excavation for Structures and Pipe <br />1 60 Acceptance Program <br />163 Blanket Material <br />200 Rock Base <br />234 Superpave Asphalt Base <br />300 Prime and Tack Coats for Base Courses <br />320 Hot Bituminous Mixtures-Cold Feed <br />330 Surface Requirements <br />334 Superpave Asphalt Concrete <br />337 Aspahlt Concrete Friction Courses <br />338 Value Added Asphalt Pavement <br />346 Portland Cement Concrete <br />347 Portland Cement Concrete - Class I (Nonstructural) <br />425 Inlets, Manholes, and Junction Boxes <br />430 Final Pipe Inspection <br />449 Precast Concrete Drainage Products <br />520 Concrete Gutter, Curb Elements, and Traffic Separator <br />521 Concrete Barriers, Traffic Railing Barriers and Parapets <br />526 Architectural Pavers <br />536 Guardrail <br />548 Retaining Wall Systems <br />560 Shop, Fielcl and Maintenance Coating of Structural Steel <br />561 Self-Curing Inorganic Zinc Coating Systems <br />562 Zinc Paint Coating <br />575 Sodding <br />580 Landscape Installation <br />611 Acceptance of Signal Installation - Submittal Requirements <br />620 Signal Installation Grounding <br />630 Installation Requirements-Conduit for Fiber Optic Cable <br />641 Prestressed Concrete Poles <br />700 Highway Signing <br /> <br />. . . 1- ,..,^^~ <br /> <br />n1 nOO-i <br /> <br />03-4122.D <br />