My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum #2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Addendum #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 3:00:59 PM
Creation date
1/27/2011 3:00:59 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SR826 / SIBlvd.
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APR-26-2007 THU 02:27 PM CALVIN GIORDANO <br />I <br /> <br />I <br /> <br />FAX NO. 9549218807 <br /> <br />P. 09 <br /> <br />SECTION 00900 <br /> <br />Addendum No.2 (April 25, 2007) <br />to <br />Contract documents <br /> <br />CITY OF SUNNY ISLES BEACH <br />STATE ROAD 8261 SUNNY ISLES BOULEVARD PROJECT <br />CGA PROJECT NO. 03-4122.D <br />CITY BID NO. 07-03-02 <br /> <br />To All Bidders: <br /> <br />Bidders for the above~referenced project shall take note of the following changes, <br />additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br /> <br />IN THE CONTRACT DOCUMENTS: <br /> <br />1. Section 00300-5 is to be replaced in its entirety. <br /> <br />2. In response to bidders RFI"S: <br />- RFI from Pre-bid Meeting: <br />1) What are the liquidated damages to be set at? $500 or $1,500. <br />Response: The liquidated damages are to be set at $1,500 as stated in Section <br />500-2 Article 3.2. <br /> <br />2) Who will be responsible for the materials testing for the project? <br />Response: All testing shall be paid for by the Contractor as stated in Section <br />00800-8 Article 13.03. <br /> <br />RFI from Solo Construction: <br />3) In section 9.1 of the instruction to bidders, a bid security is mentioned. Is this <br />the same as the bid bond? <br />Response: Yes, the bid bond and the bid security are the same. Accompanying the <br />Bid is a certified or cashiers check or a bid bond in the amount of$5% of the bid <br />payable to the Owner as stated in Section 00300-5 under Bid Security. <br /> <br />RFI from KMEC: <br />4) Did the Consultants ever coordinate the project with MDT? <br />Response: This is being verified with Marlin Engineering and will be answered on <br />a later addendum. <br /> <br />5) Has there been a design for a bus stop within the project limits, since the vision <br />is really to create a gateway to Sunny Isles Beach? <br /> <br />March 2007 <br /> <br />00900-1 <br /> <br />03-4122.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.