<br /> STATE ROAD 826/ SUNNY ISLES BOULEVARD PROJECT
<br />Bid Estimated Estimated
<br />Item Description Quantity Unit Unit Price Total
<br />I. Summary of 0200 Roadway
<br /> 1. Mobilization 1.00 LS 20,130.00 20,130.00
<br /> 2. Maintenance of Traffic 1.00 LS 68,320.00 68,320.00
<br /> 3. Commercial Material for Driveway Maintenance 250.00 CY 42.00 4,074.00
<br /> 4. Traffic Control Officer 600.00 MH 50.00 30,000.00
<br /> 5. Work Zone Signs 1332.00 ED 40.24 53,600.00
<br /> 6. Business Signs 42.00 EA 305.00 12,810.00
<br /> 7. Barrier Wall (Temporary) (F & I) (Concrete) 984.00 LF 83.70 82,350.96
<br /> 8. Barrier Wall (Temporary) (Relocate) (Concrete) 768.00 LF 39.71 30,497.28
<br /> 9. Barricade (Temporary) (Types I, II, DI, VP & DRUM) 12730.00 ED 2.64 33,607.20
<br /> 10.Barricade (Temporary) (Type III) (6') 74.00 ED 255.54 18,909.96
<br /> 11. Panels Arrow Advance Warning 132.00 ED 263.41 34,729.20
<br /> 12.High Intensity Flashing Lights, Temp-Type B 676.00 ED 101 .70 68,749.20
<br /> 13.Marker Pavt. Reflective (Temporary) 234.00 EA 248.87 58,235.58
<br /> 14.Lights (Temp-BarrWall Mount) (Type C Steady Burn) 14.00 ED 588.21 8,234.94
<br /> 15.lmpact Attenuator (Redirective Option) (Temporary) 7.00 LO 9,747.86 68,235.02
<br /> 16.Changeable-Variable Message Sign (Temporary) 112.00 ED 341.39 38,235.68
<br /> 17.Pavt. Marking Removable (White/Black) (Skip) 1380.00 LF 27.71 38,239.80
<br /> 18.Pavt. Marking Removable (White/Black) (Solid) 6580.00 LF 5.41 35,597.80
<br /> 19.Pavt. Marking Removable (White/Black) (Other) 657.00 LF 49.70 32.652.90
<br /> 20.Pavt. Marking Removable (Yellow) (Solid) 1612.00 LF 20.25 32,643.00
<br /> 21.Rock Bags 160.00 EA 12.20 1,952.00
<br /> 22.Clearing and Grubbing 1.00 LS 64,806.00 64,806.00
<br /> 23.Milling Exist Asph Pavt. (2" Avg Depth) 10523.00 SY 8.54 89,866.42
<br /> 24.Superpave Asph Cone (Traf C) (PG 76-22) 578.78 TN 183.00 105,916.74
<br /> 25.Asph Cone Friction Course (Inc Bit / Rubber) (FC-9.5) 578.78 TN 201.30 116,508.41
<br /> 26.Conc Class I (Retaining Walls) 7.00 CY 250.00 1,750.00
<br /> 27.1nlets (Curb) (Type P-2) (<10') 2 EA 10,500.00 21,000.00
<br /> 28.lnlets (Curb) (Type P-2) (>10 ') 1 EA 10,500.00 10,500.00
<br /> 29.lnlets (Curb) (Type P-6) (<10' ) 1 EA 10,500.00 10,500.00
<br /> 30.lnlets (Curb) (Type P-6) (>10') 1 EA 10,500.00 10,500.00
<br /> 31.Manhole Adjustments 8 EA 6,500.00 52,000.00
<br /> 32.Valve Boxes 7 EA 950.00 6,650.00
<br /> 33.Curb and Gutter Concrete 2,925.00 LF 42.70 124,897.50
<br /> 34.Sidewalk Concrete (4" Thick) 127.00 SY 109.80 13,944.60
<br /> 35.Sidewalk Concrete (6" Thick) 17.00 SY 146.40 2,488.80
<br /> 36.Sodding (Saint Augustine) 384 SY 12.20 4,684.80
<br /> 37.Marking (Paint) Removal 3,150.00 SF 6.10 19,215.00
<br /> March 2007 00300-2 03-4122.D
<br />
<br />
|