Laserfiche WebLink
<br />68. Signal Pedestrian Assembly Removal <br />69. Signal Pedestal Removal <br />70. Pole Removal (Shallow I Bolt on Attach) <br />71, Cntrt Assem Remove <br />72. Detector Pedestrian Assembly Remove <br />73. Conduit & Cabling Remove <br />74. Signal Equipment Misc. Remove <br />75. Sign Panels (F & I) (15 or <) <br />76. Sign Panels (Relocate) (16-100) <br />77. Sign Panels (Remove) <br /> <br />Subtotal of 0500 Signalization <br /> <br />V. <br /> <br />Summary of 0600 Landscape I Peripheral <br />78. Conduit (F&I Underground PVC SCH80) 2" <br />79. Conduit (F&I Underground PVC SCH 80) 1 1/2" <br />80. Conduit (F&I Underground PVC 80) 1" <br />81. Pull Box *F&I) <br />82. Conductors (F&I) (Insulated) (No.2) <br />83. Conductors (F&I) (Insulated) (No.8) <br />84. Conductors (F&I) (Insulated) (No.6) <br />85. Service Rack Assembly <br />86. LandScape Lighting Fixtures <br />87. Pavers, Architectural (Sidewalk) <br />88. Landscape Complete (Small Plants) <br />89. Landscape Complete (Large Plants) <br />90, Irrigation System <br />91. Trash Receptacle (F&I) (Pre-fabricated) <br />92. Benches (F&I) (Pre-fabricated) <br /> <br />7800 <br />250 <br />5040 <br />14 <br />750 <br />17020 <br />48970 <br />1 <br />110 <br />3,530.00 <br />1.00 <br />1.00 <br />1.00 <br />6.00 <br />12.00 <br /> <br />Subtotal of 0600 Landscape I Peripheral <br /> <br />VI. <br /> <br />Contingency <br /> <br />em I thru VI) <br /> <br /> <br />2.00 <br />1.00 <br />1.00 <br />1.00 <br />2.00 <br />1.00 <br />1.00 <br />2.00 <br />5.00 <br />2.00 <br /> <br />EA <br />EA <br />EA <br />EA <br />EA <br />PI <br />PI <br />EA <br />EA <br />EA <br /> <br />305.00 <br />305.00 <br />1,220.00 <br />915.00 <br />305.00 <br />1,220.00 <br />1,220.00 <br />549.00 <br />427.00 <br />244.00 <br /> <br />610.00 <br />305.00 <br />1,220.00 <br />915.00 <br />610.00 <br />1,220.00 <br />1,220.00 <br />1,098.00 <br />2,135.00 <br />488.00 <br /> <br />235,426.50 <br /> <br />LF <br />LF <br />LF <br />EA <br />LF <br />LF <br />LF <br />EA <br />EA <br />SY <br />LS <br />LS <br />LS <br />EA <br />EA <br /> <br />1.22 <br />1.22 <br />1.00 <br />1,037.00 <br />4.27 <br />0.31 <br />0.31 <br />22,481.55 <br />4,599.80 <br />39.35 <br />12,810.00 <br />528,197.20 <br />33,428.00 <br />1,220.00 <br />2,440.00 <br /> <br />9,516.00 <br />305.00 <br />5,040.00 <br />14,518.00 <br />3,202.50 <br />5,276.20 <br />15,149.70 <br />22,481.55 <br />505,978.00 <br />138,905.50 <br />12,810.00 <br />528,197.20 <br />33,428.00 <br />7,320.00 <br />29,280.00 <br /> <br />1,331,407.65 <br /> <br />LS <br /> <br />100,000.00 <br /> <br />100,000.00 <br /> <br />3,956,765.24 <br /> <br />FIFTY SIX THOUSAND SEVEN HUNDRED SIXTY FIVE DOLLARS AND TWENTY-FOUR CENTS. <br />Written <br /> <br />(Contractor) <br /> <br />~--/-o7- <br /> <br />(Date) <br /> <br />Mar-07 00300-4 03-4122.0. <br /> <br />"The requirement for substantial completion of the work within 270 consecutive calendar days must be scheduled correctly with 40 Construction. <br />Before establishing a completion date, the work must be coordinated with Florida Power and Light, Miami-Dade Water and Sewer, North Miami <br />Beach Public Utilities and the developer of the SI. Tropez condominiums. 40 Construction will be responsible for implementing the coordination of <br />all parties referenced above and producing a construction schedule for approval by the city of Sunny Isles Beach". <br />