<br /> ST A TE ROAD 826 / SUNNY ISLES BOULEV ARD PROJECT
<br />Bid Estimated Estimated
<br />Item Description Quantity Unit Unit Price Total
<br />I. Summary of 0200 Roadway
<br /> I Mobilization 1.00 LS $462,898.00 $462,898.00
<br /> 2 Maintenance of Traffic 1.00 LS $100,000.00 $100,000.00
<br /> 3 Commercial Material for Driveway Maintenance 250.00 CY $125.00 $31,250.00
<br /> 4 Traffic Control Officer 30.00 MH $60.00 $1,800.00
<br /> 5 Work Zone Signs 1332.00 ED $0.30 $399.60
<br /> 6 Business Signs 42.00 EA $300.00 $12,600.00
<br /> 7 Barrier Wall (Temporary) (F & I) (Concrete) 984.00 LF $28.00 $27,552.00
<br /> 8 Barrier Wall (Temporary) (Relocate) (Concrete) 768.00 LF $24.00 $18,432.00
<br /> 9 Barricade (Temporary) (Types I, II, Dl, VP & Drum) 12730.00 ED $0.25 $3,182.50
<br /> 10 Barricade (Temporary) (Type Ill) (6') 74.00 ED $0.50 $37.00
<br /> II Panels Arrow Advance Warning 132.00 ED $9.00 $1,188.00
<br /> 12 High Intensity Flashing Lights, Temp-Type B 676.00 ED $6.00 $4,056.00
<br /> 13 Marker Pavt Reflective (Temporary) 234.00 EA $4.00 $936.00
<br /> 14 Lights (Temp-Barr. Wall Mount) (Type C Steady Burn) 14.00 ED $5.00 $70.00
<br /> 15 Impact Attenuator (Redirective Option) (Temporary) 7.00 La $1,250.00 $8,750.00
<br /> 16 Changeable-Variable Message Sign (Temporary) 112.00 ED $60.00 $6,720.00
<br /> 17 Pavt Marking Removeable (White/Black) (Skip) 1380.00 LF $1.20 $1,656.00
<br /> 18 Pavt Marking Removeable (White/Black) (Solid) 6580.00 LF $1.30 $8,554.00
<br /> 19 Pavt Marking Removeable (White/Black) (Other) 657.00 LF $1,20 $788.40
<br /> 20 Pavt Marking Removeable (Yellow) (Solid) 1612.00 LF $1.40 $2,256.80
<br /> 21 Rock Bags 160.00 EA $125.00 $20,000.00
<br /> 22 Clearing and Grubbing 1.00 LS $60,000.00 $60,000.00
<br /> 23 Milling Exist Asph Pavt (2" Avg Depth) 10523.00 SY $10.00 $105,230.00
<br /> 24 Superpave Asph Conc (TrafC) (PG 76-22) 578.78 TN $130.00 $75,241.40
<br /> 25 Asph Conc Friction Course (lnc Bit / Rubber) (FC-9.5) 578.78 TN $150.00 $86,817.00
<br /> 26 Conc Class I (Retaining Walls) 7.00 CY $1,800.00 $12,600.00
<br /> 27 Inlets (Curb) (Type P-2) (<10') 2.00 EA $6,500.00 $13,000.00
<br /> 28 Inlets (Curb) (Type P-2) (> I 0') 1.00 EA $6,500.00 $6,500.00
<br /> 29 Inlets (Curb) (Type P-6) (<10') 1.00 EA $7,500.00 $7,500.00
<br /> 30 Inlets (Curb) (Type P-6) (>10') 1.00 EA $7,500.00 $7,500.00
<br /> 3\ Manhole Adjustments 8.00 EA $600.00 $4,800.00
<br /> 32 Valve Boxes 7.00 EA $3,500.00 $24,500.00
<br /> 33 Curb and Gutter Concrete 2925.00 LF $25.00 $73,125.00
<br /> 34 Sidewalk Concrete (4" Thick) 127.00 SY $34.00 $4,318.00
<br /> 35 Sidewalk Concrete (6" Thick) 17.00 SY $45.00 $765.00
<br /> 36 Sodding (Saint Augustine) 384.00 SY $5.00 $1,920.00
<br /> 37 Marking (Paint) Removal 3150.00 SF $2,50 $7,875.00
<br /> March 2007 00300-2 03-4122.D.
<br /> Addendum #4
<br />
|