Laserfiche WebLink
ZT, <br />BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENT'S <br />INCLUDING ALL LABOR, EQUIPMENT, SUPERVISION, TESTING AND PERMITTING TO PROVIDE A <br />COMPLETE TURN -KEY PROJECT CONFORMING TO THE REQUIREMENTS DETAILED BY THE <br />SPECIFICATIONS, MANUFACTURER, OWNER, STATE, FEDERAL AND LOCAL AGENCIES FOR THE <br />FOLLOWING LUMP SUM AND/OR UNIT PRICES. WORK INCLUDES BUT Is NOT LIMITED TO <br />GENERAL, ELECTRICAL AND MECHANICAL CONSTRUCTION. <br />BID <br />ITEM # <br />DESCRIPTION <br />UNIT <br />EST. <br />UNIT <br />EXTENDED <br />QUANTITY <br />COST <br />COST <br />Demolition of Existing HVAC Cooling Towers <br />Removal and disposal of existing <br />Infrastructure Including but not limited to so - <br />TON Chiller, 200 -Ton air cooled chiller, wood <br />service platforms, chilled water pumps, <br />LS <br />piping and relocation of exiting expansion <br />tank <br />Subtotal of Demolition of Existing HVAC Chiller Systems <br />New HVAC Chiller Systems <br />New 250 -TON water cooled Chiller to <br />installed on existing structural curbs with <br />modified steel frame Including but not <br />limited too new cooling tower, chilled water <br />2. <br />pumps, condenser pumps, piping, wall <br />LS <br />$ Glei'Its <br />mounted variable frequency drives, <br />filtration/treatment system, backflow <br />preventer and electrical components <br />I- <br />Subtotal of New HVAC Chiller Systems <br />I <br />I --I----- <br />Temporary Chiller System <br />Temporary Chiller to serve the replace the <br />I <br />existing Chiller system for the entire facility <br />L$.-1 <br />$ <br />as needed during system turnover <br />City of Sunny isles Beach I invitation to Bid No. 16-09-02 1111 1 1 <br />