Laserfiche WebLink
.,,, o i H per. <br />BID FORM 3 <br />BID PRICING <br />BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS <br />INCLUDING ALL LABOR, EQUIPMENT, SUPERVISION, TESTING AND PERMITTING TO PROVIDE A <br />COMPLETE TURN -KEY PROJECT CONFORMING TO THE REQUIREMENTS DETAILED BY THE <br />SPECIFICATIONS, MANUFACTURER, OWNER, STATE, FEDERAL AND LOCAL AGENCIES FOR THE <br />FOLLOWING LUMP SUM AND/OR UNIT PRICES. WORK INCLUDES BUT IS NOT LIMITED TO <br />GENERAL, ELECTRICAL AND MECHANICAL CONSTRUCTION. <br />BID <br />EST. <br />UNIT <br />EXTENDED <br />ITEM # <br />DESCRIPTION <br />UNIT <br />QUANTITY <br />COST <br />COST <br />Demolition of Existing HVAC Cooling Towers <br />Removal and disposal of existing <br />infrastructure including but not limited to 50 - <br />TON Chiller, 200 -Ton air cooled chiller, wood <br />LS <br />1 <br />$ <br />$19,822 <br />1 <br />service platforms, chilled water pumps, <br />piping and relocation of exiting expansion <br />tank <br />Subtotal of Demolition of Existing HVAC Chiller Systems <br />,$19,822 <br />New HVAC Chiller Systems <br />New 250 -TON water cooled Chiller to <br />installed on existing structural curbs with <br />modified steel frame including but not <br />limited too new cooling tower, chilled water <br />LS <br />1 <br />$ <br />$840,541 <br />2 <br />pumps, condenser pumps, piping, wall <br />mounted variable frequency drives, <br />filtration/treatment system, backflow <br />preventer and electrical components <br />Subtotal of New HVAC Chiller Systems <br />Temporary Chiller System <br />Temporary Chiller to serve the replace the <br />3. <br />existing Chiller system for the entire facility <br />LS <br />1 <br />$ $32,834 <br />as needed during system turnover <br />City of Sunny Isles Beach I Invitation to Bid No. 16-09-02 <br />