My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />10.2 Failure of the successful Bidder to enter into the Contract in accordance <br />with his Bid, or failure to furnish the required bonds will be just cause for <br />an annulment of the award with the amount of the bid security being <br />forfeited to the Owner as liquidated damages, not as a penalty. <br /> <br />10.3 Should a Bid Bond be used, acceptable surety companies shall be <br />determined from the latest United States Treasury Department's list of <br />companies holding certificates of authority as acceptable Sureties on <br />Federal Bonds. Requirements for Acceptable Surety Companies are <br />outlined in Item 15.4. <br />10.4 The Owner may retain the bid security of those Bidders to whom an award <br />may be considered until successful execution of the Contract and bonds; <br />or the specified time for holding bids has elapsed; or all Bids have been <br />rejected. <br /> <br />11. MODIFICATION AND WITHDRAWAL OF BID <br /> <br />11.1 Prior to the time of bid opening, a Bidder may withdraw his Bid at any <br />time, but may not resubmit it. Bids may not be modified after submittal. <br /> <br />11.2 After the bid opening, no Bid may be withdrawn, canceled or modified for <br />a period of 90 days after the time and date designated for the receipt of <br />bids. <br /> <br />12. OPENING OF BIDS <br /> <br />12.1 Bids submitted will be opened publicly and read aloud at the time and <br />place stated in the Advertisement for Bids. <br /> <br />13. GOVERNING LAWS AND REGULATIONS <br /> <br />13.1 Bidders shall be familiar with all federal, state, and local laws, ordinances, <br />rules, and regulations that may in any way affect the Work. <br /> <br />13.2 Trench Safety Act: The Occupational Safety and Health Administration <br />excavation safety standards, 29 CFR 1926.650 Subpart P trench safety <br />standards will be in effect during the period of construction of the Project. <br />In compliance with current State of Florida statutes, the Bidder shall <br />provide documentation required by the Florida Trench Safety statute to the <br />Owner, in conjunction with the Bid Form. <br /> <br />14. LIQUIDATED DAMAGES <br /> <br />14.1 The Owner may incur financial loss if the Work is not substantially <br />complete by the date set forth in the Agreement. The Contractor (and his <br />Surety) shall be liable for liquidated damages in accordance with the <br />Supplementary Conditions and the Agreement. <br /> <br />Final Version 6/07 <br /> <br />00100-5 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.