My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 01340 <br />SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES <br /> <br />PART 1 - GENERAL <br /> <br />1.01 REQUIREMENTS INCLUDED <br /> <br />A. The Contractor shall submit to the Engineer for review, such working drawings, <br />shop drawings, test reports and data on materials and equipment (hereinafter in <br />this article called data), and material samples (hereinafter in this article called <br />samples) as are required for the proper control of work, including but not limited <br />to those working drawings, shop drawings, data and samples for materials and <br />equipment specified elsewhere in the Specifications and in the Contract <br />Drawings. <br /> <br />B. Within thirty (30) calendar days after the effective date of the Agreement, the <br />Contractor shall submit to the Engineer a complete list of preliminary data for <br />which Shop Drawings are to be submitted. Included in this list shall be the names <br />of all proposed manufacturers furnishing specific items. Review of this list by the <br />Engineer shall in no way expressed or implied relieve the Contractor from <br />submitting complete Shop Drawings and providing materials, equipment, etc., <br />fully in accordance with the Specifications. This procedure is required in order to <br />expedite final review of Shop Drawings. <br /> <br />C. The contractor is to maintain an accurate updated submittal log and will bring this <br />log to each scheduled progress meeting with the Owner and Engineer. This log <br />should include the following items: <br /> <br />1. Submittal-Description and Number assigned. <br /> <br />2. Date to Engineer. <br /> <br />3. Date returned to Contractor (from Engineer). <br /> <br />4. Status of Submittal (Approved/Resubmit/Rejected). <br /> <br />5. Date of Resubmittal and Return (as applicable). <br /> <br />6. Date material released (for fabrication). <br /> <br />7. Projected date of fabrication. <br /> <br />8. Projected date of delivery to site. <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />A. <br /> <br />Section 01600: <br /> <br />Material and Equipment <br /> <br />B. <br /> <br />Section 01720: <br /> <br />Project Record Documents <br /> <br />06/07 <br /> <br />01340-1 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.