My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />18.2 It is the intent of the Owner to award a Contract to the lowest responsible <br />Total Base Bidder whose Bid is in conformance with the Bidding <br />Documents and does not exceed the funds available. <br /> <br />18.3 Upon acceptance of a Bid and award of the Contract, the successful <br />Bidder shall deliver the executed Contract, along with required bonds and <br />any other items requested, to the Owner within 10 days. Failure to do so <br />will be deemed as a breach of agreement by the Bidder and result in <br />forfeiture of bid security as described in the Instructions to Bidders. <br /> <br />18.4 The Owner reserves the right to hold all proposals and bid guarantees for <br />a period not to exceed 90 days after the date of bid opening stated in the <br />Advertisement for Bids. <br /> <br />18.5 The award of the contract, if it is awarded, will be to the lowest responsible <br />total base bidder whose qualifications indicate the award will be to the <br />best interest of the Owner and whose proposal shall comply with the <br />requirements of the Contract Documents. Time is of the essence for this <br />project and the time limits set in the proposal, if set by the bidder, will be <br />accorded weight by the Owner in the determination of the best proposal. <br />In no case will the award be made until all necessary investigations have <br />been made into the responsibility of the low bidder and the Owner is <br />satisfied that the bidder is qualified to do the Work and have the <br />necessary organization, capital and equipment to carry out the provisions <br />of the contract to the satisfaction of the Owner within the time specified. <br /> <br />18.7 If the Contractor feels that a problem exists either prior to, or during the <br />bid opening, he/she shall contact the City (within 24 hours of the bid <br />opening) and follow the City's current policy for bid protests. <br /> <br />18.8 The Owner reserves the right to award as a total contract any combination <br />of the Unit Price Bid Schedule Items that would be in the best interest of <br />the Owner. <br /> <br />19. CASH ALLOWANCES <br /> <br />19.1 The Bidder is advised that a space is provided in the Bid Form, Document <br />00300, for this purpose only. The Contractor shall not proceed on any <br />additional work to be covered by allowances until authorized in writing by <br />the Engineer. Such work shall be approved by the Owner, shall be within <br />the scope of work defined by this Contract and shall not exceed the <br />amount indicated in the Bid Form. Any amount remaining in the Cash <br />Allowance will be retained by the Owner. <br /> <br />END OF DOCUMENT <br /> <br />Final Version 6/07 <br /> <br />00100-8 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.