My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.04 <br /> <br />06/07 <br /> <br />due to such operations. The Contractor shall take all possible precautions for the <br />protection of unforeseen utility lines to provide for uninterrupted service and to <br />provide such special protection as may be necessary. <br /> <br />F. In case it shall be necessary to move the property of any public utility or franchise <br />holder, such utility company or franchise holder will, upon request of the <br />Contractor, be notified by the Owner to move such property within a specified <br />reasonable time. When utility lines that are to be removed are encountered within <br />the area of operations, the Contractor shall notify the Engineer a sufficient time in <br />advance for the necessary measures to be taken to prevent interruption of service. <br /> <br />G. Where the proper completion of the work requires the temporary or permanent <br />removal and/or relocation of an existing utility or other improvement that is <br />indicated, the Contractor shall remove and, without unnecessary delay, temporarily <br />replace or relocate such utility or improvement in a manner satisfactory to the <br />Engineer and the owner of the facility. In all cases of such temporary removal or <br />relocation, restoration to former location shall be accomplished by the Contractor in <br />a manner that will restore or replace the utility or improvement as nearly as <br />possible to its former locations and to as good or better condition than found prior <br />to removal. <br /> <br />H. Existing utility lines that are indicated or the locations of which are made known to <br />the Contractor prior to excavation and that are to be retained, and all utility lines <br />that are constructed during excavation operations shall be protected from damage <br />during excavation and backfilling and, if damaged, shall be immediately repaired or <br />replaced by the Contractor at the Contractor's expense. Sewer laterals are <br />included. <br /> <br />I. All repairs to a damaged utility or improvement are subject to inspection and <br />approval by an authorized representative of the utility or improvement owner before <br />being concealed by backfill or other work. <br /> <br />J. All oil and gasoline pipelines, power, and telephone or the communication cable <br />ducts, gas and water mains, irrigation lines, sewer lines, storm drain lines, poles, <br />and overhead power and communication wires and cables encountered along the <br />line of the work shall remain continuously in service during all the operations under <br />the Contract, unless other arrangements satisfactory to the Engineer are made <br />with the owner of said pipelines, duct, main, irrigation line, sewer, storm drain, pole, <br />or wire or cable. The Contractor shall be responsible for and shall repair all <br />damage due to its operations, and the provisions of this Section shall not be <br />abated even in the event such damage occurs after backfilling or is not discovered <br />until after completion of the backfilling. <br /> <br />SITE CLEANLINESS <br /> <br />A. Dust Abatement - The Contractor shall furnish all labor, equipment, and means <br />required and shall carry out effective measures wherever and as often as <br />necessary to prevent its operation from producing dust in amounts damaging to <br />property, cultivated vegetation, or domestic animals, or causing a nuisance to <br />persons living in or occupying buildings in the vicinity. The Contractor shall be <br /> <br />01505-2 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.