Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.04 <br /> <br />1.05 <br /> <br />06/07 <br /> <br />RECORDING <br /> <br />A. Label each document "PROJECT RECORD" in neat large printed letters. <br /> <br />B. Record information concurrently with construction progress. <br /> <br />C. Drawings; Legibly mark record actual construction: <br /> <br />1. Depths of various elements of foundation in relation to finish grade <br />elevations. <br /> <br />2. All underground piping with elevations and dimensions. Changes to <br />piping location. Actual installed pipe material, class, etc. <br /> <br />3. Location of internal utilities and appurtenances concealed in the <br />construction, referenced to visible and accessible features of the <br />structure. <br /> <br />4. Field changes of dimensions and details. <br /> <br />5. Changes made by Field Order or by Change Order. <br /> <br />6. Details not on original contract drawings. <br /> <br />7. Equipment and piping relocations. <br /> <br />D. Specifications and Addenda; legibly mark each Section to record: <br /> <br />1. Manufacturer, trade name, catalog number and supplier of each product <br />and item of equipment actually installed. <br /> <br />2. Changes made by field order or by Change Order. <br /> <br />E. Shop Drawings (after final review and approval): <br /> <br />1. One set of record shop drawings for each process equipment, piping, <br />(including casings) electrical system and instrumentation system. <br /> <br />SUBMITTAL <br /> <br />A. At Close-out, deliver Record Documents to the Engineer for the Owner. <br /> <br />B. Accompany submittal with transmittal letter in duplicate, containing: <br /> <br />1. Date <br /> <br />2. Project Title and Number <br /> <br />3. Contractor's Name and Address <br /> <br />4. Title and Number of each Record Document <br /> <br />01720-2 <br /> <br />03-4197 <br />