My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.04 <br /> <br />1.05 <br /> <br />06/07 <br /> <br />RECORDING <br /> <br />A. Label each document "PROJECT RECORD" in neat large printed letters. <br /> <br />B. Record information concurrently with construction progress. <br /> <br />C. Drawings; Legibly mark record actual construction: <br /> <br />1. Depths of various elements of foundation in relation to finish grade <br />elevations. <br /> <br />2. All underground piping with elevations and dimensions. Changes to <br />piping location. Actual installed pipe material, class, etc. <br /> <br />3. Location of internal utilities and appurtenances concealed in the <br />construction, referenced to visible and accessible features of the <br />structure. <br /> <br />4. Field changes of dimensions and details. <br /> <br />5. Changes made by Field Order or by Change Order. <br /> <br />6. Details not on original contract drawings. <br /> <br />7. Equipment and piping relocations. <br /> <br />D. Specifications and Addenda; legibly mark each Section to record: <br /> <br />1. Manufacturer, trade name, catalog number and supplier of each product <br />and item of equipment actually installed. <br /> <br />2. Changes made by field order or by Change Order. <br /> <br />E. Shop Drawings (after final review and approval): <br /> <br />1. One set of record shop drawings for each process equipment, piping, <br />(including casings) electrical system and instrumentation system. <br /> <br />SUBMITTAL <br /> <br />A. At Close-out, deliver Record Documents to the Engineer for the Owner. <br /> <br />B. Accompany submittal with transmittal letter in duplicate, containing: <br /> <br />1. Date <br /> <br />2. Project Title and Number <br /> <br />3. Contractor's Name and Address <br /> <br />4. Title and Number of each Record Document <br /> <br />01720-2 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.