My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.07 <br /> <br />06/07 <br /> <br />a. Catalog number, size, composition. <br />b. Color and texture designations. <br />c. Information required for re-ordering special-manufactured <br />products. <br /> <br />2. Instructions for care and maintenance. <br /> <br />a. Manufacturer's recommendation for types of cleaning agents and <br />methods. <br />b. Cautions against cleaning agents and methods which are <br />detrimental to product. <br />c. Recommended schedule for cleaning and maintenance. <br /> <br />C. Content, for moisture-protection and weather-exposed products: <br /> <br />1. Manufacturer's data, giving full information on products: <br /> <br />a. Applicable standards. <br />b. Chemical composition. <br />c. Details of installation. <br /> <br />2. Instructions for inspection, maintenance and repair. <br /> <br />D. <br /> <br />Additional requirements for maintenance data: <br />Specifications. <br /> <br />Respective sections of <br /> <br />E. Provide complete information for products specified. <br /> <br />MANUAL FOR EQUIPMENT AND SYSTEMS <br /> <br />A. Submit five copies of complete manual in final form. <br /> <br />B. Content, for each unit of equipment and system, as appropriate: <br /> <br />1. Description of unit and component parts. <br /> <br />a. Function, normal operating characteristics and limiting conditions <br />b. Performance curves, engineering data and tests <br />c. Complete nomenclature and commercial number of replaceable <br />parts <br /> <br />2. Operating procedures: <br /> <br />a. Startup, break-in, routine and normal operating instructions <br />b. Regulation, control, stopping, shutdown and emergency <br />instructions <br />c. Summer and winter operating instructions <br />d. Special operating instructions <br /> <br />01730-4 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.