My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />EJCDC <br />STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR <br />ON THE BASIS OF A STIPULATED PRICE <br /> <br />THIS AGREEMENT is dated as of the day of in the year 20_ by and between <br />CITY OF SUNNY ISLES BEACH (hereinafter called OWNER) and <br />(hereinafter called CONTRACTOR). <br /> <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as <br />follows: <br /> <br />Article 1. WORK. <br /> <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents, The Work <br />is generally described as follows: <br /> <br />172nd Street Roadwav Improvements <br />Consistinq of the reconstruction of N.E, 172nd Street includinq: pavinq, qrading, drainaqe, liqhtinq <br />improvements, traffic separators, sidewalks, and landscapinq. <br /> <br />Article 2. ENGINEER. <br /> <br />The Project has been designed by: <br />Calvin, Giordano & Associates, Inc. <br />1800 Eller Drive, Suite 600 <br />Fort Lauderdale, FL 33316 <br />(954) 921-7781 <br /> <br />who is hereinafter called ENGINEER and who is to act as OWNER'S representative, assume all duties <br />and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents <br />in connection with completion of the Work in accordance with the Contract Documents. <br /> <br />Article 3. CONTRACT TIMES. <br /> <br />3.1. The work will be substantially completed within 270 calendar days after the date when the <br />Contract Times commence to run completed and ready for final payment in accordance with <br />paragraph 14.07 of the General Conditions within 300 calendar days after the date when the <br />Contract Times commence to run. <br /> <br />3.2. L1QUIDA TED DAMAGES. OWNER and CONTRACTOR recognize that time is of the essence <br />of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the <br />times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with <br />Article 12 of the General Conditions. They also recognize the delays, expense and difficulties <br />involved in proving the actual loss suffered by OWNER if the Work is not completed on time. <br />Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as <br />liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER One <br />Thousand Five Hundred and 00/100 dollars ($1500.00) for each day that expires after the time <br />specified in paragraph 3.1 for each Substantial Completion date until the Work is substantially <br />complete. If CONTRACTOR shall neglect, refuse or fail to complete the project by the project <br />completion date within the time specified in paragraph 3.1 for completion and readiness for final <br />payment or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER <br />One Thousand and 00/100 dollars ($1000.00) for each day that expires after the time specified in <br />paragraph 3,1 for completion and readiness for final payment. <br /> <br />Final Version 6/07 <br /> <br />00500-1 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.