Laserfiche WebLink
<br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />19, Engineer--The individual or entity named <br />as such in the Agreement. <br /> <br />20, Field Order--A written order issued by <br />Engineer which requires minor changes in the Work <br />but which does not involve a change in the Contract <br />Price or the Contract Times, <br /> <br />21. General Requirements--Sections of <br />Division 1 of the Specifications. The General <br />Requirements pertain to all sections of the Specifica- <br />tions, <br /> <br />22. Hazardous Environmental Condition-- <br />The presence at the Site of Asbestos, PCBs, Petro- <br />leum, Hazardous Waste, or Radioactive Material in <br />such quantities or circumstances that may present a <br />substantial danger to persons or property exposed <br />thereto in connection with the Work, <br /> <br />23. Hazardous Waste--The term Hazardous <br />Waste shall have the meaning provided in Section <br />1004 of the Solid Waste Disposal Act (42 USC <br />Section 6903) as amended from time to time. <br /> <br />24. Laws and Regulations; Laws or Regulat- <br />ions--Any and all applicable laws, rules, regulations, <br />ordinances, codes, and orders of any and all govern- <br />mental bodies, agencies, authorities, and courts <br />having jurisdiction. <br /> <br />25. Liens--Charges, security interests, or <br />encumbrances upon Project funds, real property, or <br />personal property. <br /> <br />26. Milestone--A principal event specified in <br />the Contract Documents relating to an intermediate <br />completion date or time prior to Substantial Comple- <br />tion of all the Work. <br /> <br />27. Notice of Award--The written notice by <br />Owner to the Successful Bidder stating that upon <br />timely compliance by the Successful Bidder with the <br />conditions precedent listed therein, Owner will sign <br />and deliver the Agreement. <br /> <br />28. Notice to Proceed--A written notice given <br />by Owner to Contractor fixing the date on which the <br />Contract Times will commence to run and on which <br />Contractor shall start to perform the Work under the <br />Contract Documents. <br /> <br />29, Owner--The individual or entity with <br />whom Contractor has entered into the Agreement <br />and for whom the Work is to be performed, <br /> <br />30. PCBs--Polychlorinated biphenyls. <br /> <br />31. Petroleum--Petroleum, including crude <br />oil or any fraction thereof which is liquid at standard <br />conditions of temperature and pressure (60 degrees <br />Fahrenheit and 14.7 pounds per square inch <br />absolute), such as oil, petroleum, fuel oil, oil sludge, <br />oil refuse, gasoline, kerosene, and oil mixed with <br />other non-Hazardous Waste and crude oils, <br /> <br />32. Progress Schedule--A schedule, <br />prepared and maintained by Contractor, describing <br />the sequence and duration of the activities <br />comprising the Contractor's plan to accomplish the <br />Work within the Contract Times. <br /> <br />33. Project-- The total construction of which <br />the Work to be performed under the Contract <br />Documents may be the whole, or a part. <br /> <br />34. Project Manua/--The bound <br />documentary information prepared for bidding and <br />constructing the Work. A listing of the contents of the <br />Project Manual, which may be bound in one or more <br />volumes, is contained in the table(s) of contents. <br /> <br />35. Radioactive Materia/--Source, special <br />nuclear, or byproduct material as defined by the <br />Atomic Energy Act of 1954 (42 USC Section 2011 et <br />seq.) as amended from time to time. <br /> <br />36. Related Entity -- An officer, director, <br />partner, employee, agent, consultant, or <br />subcontractor. <br /> <br />37. Resident Project Representative--The <br />authorized representative of Engineer who may be <br />assigned to the Site or any part thereof. <br /> <br />38. Samples--Physical examples of <br />materials, equipment, or workmanship that are <br />representative of some portion of the Work and <br />which establish the standards by which such portion <br />of the Work will be judged. <br /> <br />39. Schedule of Submittals--A schedule, <br />prepared and maintained by Contractor, of required <br />submittals and the time requirements to support <br />scheduled performance of related construction <br />activities. <br /> <br />40. Schedule of Values--A schedule, <br />prepared and maintained by Contractor, allocating <br />portions of the Contract Price to various portions of <br />the Work and used as the basis for reviewing <br />Contractor's Applications for Payment. <br /> <br />41. Shop Drawings--AII drawings, diagrams, <br />illustrations, schedules, and other data or <br />information which are specifically prepared or <br /> <br />E./CDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright <e> 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 7 <br /> <br />Final Version 01/07 <br /> <br />03-4197 <br />