Laserfiche WebLink
<br />I <br /> <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />contrary to the provisions of Paragraph 9,09 or any <br />other provision of the Contract Documents. <br /> <br />C,Day <br /> <br />1. The word "day" means a calendar <br />day of 24 hours measured from midnight to the next <br />midnight. <br /> <br />D. Defective <br /> <br />1. The word "defective," when modifying the <br />word "Work," refers to Work that is unsatisfactory, <br />faulty, or deficient in that it: <br /> <br />a. does not conform to the Contract <br />Documents, or <br /> <br />b. does not meet the requirements of any <br />applicable inspection, reference standard, <br />test, or approval referred to in the Contract <br />Documents, or <br /> <br />c. has been damaged prior to Engineer's - <br />recommendation of final payment (unless <br />responsibility for the protection thereof has <br />been assumed by Owner at Substantial <br />Completion in accordance with Paragraph <br />14,04 or 14.05). <br /> <br />E. Furnish, Install, Perform, Provide <br /> <br />1. The word "furnish," when used in connec- <br />tion with services, materials, or equipment, shall <br />mean to supply and deliver said services, materials, <br />or equipment to the Site (or some other specified <br />location) ready for use or installation and in usable <br />or operable condition. <br /> <br />2. The word "install," when used in connec- <br />tion with services, materials, or equipment, shall <br />mean to put into use or place in final position said <br />services, materials, or equipment complete and <br />ready for intended use. <br /> <br />3. The words "perform" or "provide," when <br />used in connection with services, materials, or <br />equipment, shall mean to furnish and install said <br />services, materials, or equipment complete and <br />ready for intended use, <br /> <br />4. When "furnish," "install," "perform," or <br />"provide" is not used in connection with services, <br />materials, or equipment in a context clearly requiring <br />an obligation of Contractor, "provide" is implied. <br /> <br />F. Unless stated otherwise in the Contract <br />Documents, words or phrases which have a well- <br />known technical or construction industry or trade <br /> <br />meaning are used in the Contract Documents in <br />accordance with such recognized meaning. <br /> <br />ARTICLE 2 - PRELIMINARY MATTERS <br /> <br />2.01 Delivery of Bonds and Evidence of <br />Insurance <br /> <br />A. When Contractor delivers the executed <br />counterparts of the Agreement to Owner, Contractor <br />shall also deliver to Owner such bonds as <br />Contractor may be required to furnish. <br /> <br />B. Evidence of Insurance: Before any Work <br />at the Site is started, Contractor and Owner shall <br />each deliver to the other, with copies to each <br />additional insured identified in the Supplementary <br />Conditions, certificates of insurance (and other <br />evidence of insurance which either of them or any <br />additional insured may reasonably request) which <br />Contractor and Owner respectively are required to <br />purchase and maintain in accordance with Article 5. <br /> <br />2.02 Copies of Documents <br /> <br />A. Owner shall furnish to Contractor up to <br />ten printed or hard copies of the Drawings and <br />Project Manual. Additional copies will be furnished <br />upon request at the cost of reproduction. <br /> <br />2.03 Commencement of Contract Times; Notice <br />to Proceed <br /> <br />A. The Contract Times will commence to run <br />on the thirtieth day after the Effective Date of the <br />Agreement or, if a Notice to Proceed is given, on the <br />day indicated in the Notice to Proceed. A Notice to <br />Proceed may be given at any time within 30 days <br />after the Effective Date of the Agreement. In no <br />event will the Contract Times commence to run later <br />than the sixtieth day after the day of Bid opening or <br />the thirtieth day after the Effective Date of the <br />Agreement, whichever date is earlier. <br /> <br />2.04 Starting the Work <br /> <br />A. Contractor shall start to perform the Work <br />on the date when the Contract Times commence to <br />run. No Work shall be done at the Site prior to the <br />date on which the Contract Times commence to run. <br /> <br />2.05 Before Starting Construction <br /> <br />A. Preliminary Schedules: Within 10 days <br />after the Effective Date of the Agreement (unless <br />otherwise specified in the General Requirements), <br /> <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright @ 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 9 <br /> <br />Final Version 01/07 <br /> <br />03-4197 <br />