My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />1. Engineer will provide timely review of <br />Shop Drawings and Samples in accordance with the <br />Schedule of Submittals acceptable to Engineer. <br />Engineer's review and approval will be only to deter- <br />mine if the items covered by the submittals will, after <br />installation or incorporation in the Work, conform to <br />the information given in the Contract Documents and <br />be compatible with the design concept of the <br />completed Project as a functioning whole as <br />indicated by the Contract Documents. <br /> <br />2. Engineer's review and approval will not <br />extend to means, methods, techniques, sequences, <br />or procedures of construction (except where a <br />particular means, method, technique, sequence, or <br />procedure of construction is specifically and ex- <br />pressly called for by the Contract Documents) or to <br />safety precautions or programs incident thereto. The <br />review and approval of a separate item as such will <br />not indicate approval of the assembly in which the <br />item functions. <br /> <br />3. Engineer's review and approval shall not <br />relieve Contractor from responsibility for any <br />variation from the requirements of the Contract <br />Documents unless Contractor has complied with the <br />requirements of Paragraph 6.17. C.3 and Engineer <br />has given written approval of each such variation by <br />specific written notation thereof incorporated in or <br />accompanying the Shop Drawing or Sample. <br />Engineer's review and approval shall not relieve <br />Contractor from responsibility for complying with the <br />requirements of Paragraph 6.17. C.1. <br /> <br />E. Resubmiltal Procedures <br /> <br />1. Contractor shall make corrections <br />required by Engineer and shall return the required <br />number of corrected copies of Shop Drawings and <br />submit, as required, new Samples for review and <br />approval. Contractor shall direct specific attention in <br />writing to revisions other than the corrections called <br />for by Engineer on previous submittals, <br /> <br />6,18 Continuing the Work <br /> <br />A. Contractor shall carryon the Work and <br />adhere to the Progress Schedule during all disputes <br />or disagreements with Owner. No Work shall be <br />delayed or postponed pending resolution of any <br />disputes or disagreements, except as permitted by <br />Paragraph 15.04 or as Owner and Contractor may <br />otherwise agree in writing. <br /> <br />6.19 Contractor's General Warranty and Guaran- <br />tee <br /> <br />A. Contractor warrants and guarantees to <br />Owner that all Work will be in accordance with the <br />Contract Documents and will not be defective. <br />Engineer and its Related Entities shall be entitled to <br />rely on representation of Contractor's warranty and <br />guarantee. <br /> <br />B. Contractor's warranty and guarantee <br />hereunder excludes defects or damage caused by: <br /> <br />1. abuse, modification, or improper main- <br />tenance or operation by persons other than <br />Contractor, Subcontractors, Suppliers, or any other <br />individual or entity for whom Contractor is <br />responsible; or <br /> <br />2. normal wear and tear under normal <br /> <br />usage. <br /> <br />C. Contractor's obligation to perform and <br />complete the Work in accordance with the Contract <br />Documents shall be absolute. None of the following <br />will constitute an acceptance of Work that is not in <br />accordance with the Contract Documents or a <br />release of Contractor's obligation to perform the <br />Work in accordance with the Contract Documents: <br /> <br />1. observations by Engineer; <br /> <br />2. recommendation by Engineer or payment <br />by Owner of any progress or final payment; <br /> <br />3. the issuance of a certificate of Substantial <br />Completion by Engineer or any payment related <br />thereto by Owner; <br /> <br />4. use or occupancy of the Work or any part <br />thereof by Owner; <br /> <br />5. any review and approval of a Shop Draw- <br />ing or Sample submittal or the issuance of a notice <br />of acceptability by Engineer; <br /> <br />6. any inspection, test, or approval by <br />others; or <br /> <br />7. any correction of defective Work by <br />Owner. <br /> <br />6.20 Indemnification <br /> <br />A. To the fullest extent permitted by Laws <br />and Regulations, Contractor shall indemnify and <br />hold harmless Owner and Engineer, and the officers, <br />directors, partners, employees, agents, consultants <br />and subcontractors of each and any of them from <br /> <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright ~ 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 26 <br /> <br />Final Version 01/07 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.