My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2011-1661
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2011
>
Reso 2011-1661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2013 2:34:16 PM
Creation date
2/4/2011 12:22:36 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2011-1661
Date (mm/dd/yyyy)
01/20/2011
Description
Agmt w/Wright Express Financial Srvs for Unleaded Fuel Card Program
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />7. Inspection at Contractor's Site. The Customer reserves the right to inspect, at any <br />reasonable time with prior notice, the equipment or product or plant or other facilities of a <br />Contractor to assess conformity with Contract requirements and to detemrine whether they are <br />adequate and suitable for proper and effective Contract performance. <br /> <br />8. Safety Standards. All manufactured items and fabricated assemblies subject to operation <br />under pressure, operation by connection to an electric source, or operation involving connection <br />to a manufactured, natural, or LP gas source shall be constnlcted and approved in a manner <br />acceptable to the appropriate State inspector. Acceptability customarily requires, at a minimum, <br />identification marking of the appropriate safety standard organization, where such approvals of <br />listings have been established for the type of device offered and furnished, for example: the <br />American Society of Mechanical Engineers for pressure vessels; the Underwriters Laboratories <br />and/or National Electrical Manufacturers' Association for electrically operated assemblies; and <br />the American Gas Association for gas-operated assemblies. In addition, all items furnished sha1l <br />meet all applicable requirements of the Occupational Safety and Health Act and state and .federal <br />requirements relating to clean air and water pollution. <br /> <br />9. Americans with Disabilities Act Contractors should identifY any products that may be used <br />or adapted for use by visually, hearing, or other physically impaired individuals. <br /> <br />10. Literature. Upon request, the Contractor shall furnish literature reasonably related to the <br />product offered, for example, user manuals, price schedules, catalogs, descriptive brochures, etc. <br /> <br />11. Traosp.ortatioD and Delivery. Prices shall include all charges for packing, handling, <br />freight, distributiQn, and inside delivery. Transportation of goods shall be FOB Destination to <br />any point within thirty (30) days after the Customer places an Order. A Contractor, within five <br />(5) days after receiving a purchase order, shall notify the Customer of any potential delivery <br />delays. Evidence of inability or .intentional delays shall be cause: for Contract cancellation and <br />Contractor suspension. <br /> <br />12. Installation. Where installation is required, Contractor shall be responsible for placing and <br />installing the product in the required locations at no additional charge, unless other\'...ise <br />designated on the Contract or purchase order. Contractor's authorized product and price list <br />shall clearly and separately identify any additional installation charges. All materials used in the <br />installation shall be of good quality and shall be free of defects that would diminish the <br />appearance of the product or render it structurally or operationally unsound. Installation includes <br />the furnishing of any equipment, rigging, and materials required to install or replace the product <br />in the proper location. 'Contractor shall protect the site from damage and shall repair damages or <br />injury caused during installation by Contractor or its employees or agents, If any alteration, <br />dismantling, excavation. etc., is required to achieve installation, the Contractor shall promptly <br />restore the structure or site to its original condition. Contractor shall perform installation work <br />so 'as' to- cause. the 'least inconvenience and .interference .with .Gustemers .and .with. -proper <br />consideration of others on site. Upon completion of the installation, the location and sWTounding <br />area of work shall be left clean and in a neat and unobstructed condition, with everything in <br />satisfactory repair and order. <br /> <br />.,,, <br /> <br />(\Y. !q <br />~>> l'otl <br />
The URL can be used to link to this page
Your browser does not support the video tag.