5ET TOP OF ROOT
<br />BALL AT ORIGINAL
<br />PLANTING DEPTH.
<br />5" MULCH LAYER
<br />OVER ENTIRE BED
<br />LTb
<br />DERIVED FROM
<br />SHRUB 5PAGING.
<br />BALL DIAM. —�
<br />i
<br />01
<br />PL- 0ET- I3.DVVG
<br />KEEP MULCH 3"
<br />AWAY FROM PLANT
<br />MATERIAL
<br />3" 5AUGER
<br />BERM
<br />PLANTING 501L
<br />-COMPACTED
<br />EXISTING
<br />SUB6RADE
<br />SHRUB PLANTING DETAI
<br />.... ................
<br />KEEP MULCH 3"
<br />AWA'I' FROM PLANT
<br />MATERIAL
<br />+ « ♦.«
<br />+. «..
<br />. ♦..•
<br />3" MULCH
<br />F
<br />GRADE
<br />BALL DIAM.
<br />L
<br />PLANTING 501L
<br />UNDISTURBED
<br />OR COMPACTED
<br />5UBGRADE
<br />EXCAVATE TO A MIN.
<br />DEPTH OF 12"
<br />02 GROUNDCOVER PLANTING
<br />0.
<br />TOPSOIL
<br />N.T.5.
<br />PRUNE 4 TIE FRONDS
<br />PROTECTIVE TREE
<br />15AN PING S— 2 X A
<br />(IS" LONG), EVENLY
<br />SPACED OVER FOUR
<br />LAYERS OF fIFLAP
<br />PADDING & 61564 TI?
<br />W/ f5ANDIN6.
<br />SUPPORT SrA <,E5 (A
<br />PER PALM) 2— 2 X A
<br />NAILED TOC -ETt EK
<br />NAIL SUPPORr TO
<br />PROrEGTIVE 15ANPING
<br />& REINF. W/ STEEL
<br />6Ti2APPIN6. WGLT
<br />SUPPORT TO LOWER
<br />P05TS. DO NOT
<br />NAIL TO TRUNK.
<br />6" DIAMETER OPEN AREA
<br />TOP OF ROOT PALL 107
<br />ADOVE LAW66APE SOIL
<br />3" APPROVED MJ-&H
<br />6" WERM
<br />FINISH GRADE
<br />60WA6TED 6Up6RADE
<br />SPECIFIED PLANTING SOIL
<br />LOWER P05T5
<br />(A PER PALM) 2 X A'S
<br />IV LON&
<br />0. 1/2 ROOT PALL,
<br />R 15 GREATER
<br />04 PALM STAKING DETAIL
<br />N.T.5. PL —DET —I (.DWG
<br />GENERAL PLANTING NOTES:
<br />ATM TO REMAIN SMALL BE PROTECTED DURING ALL
<br />PMASM. ANY TRM 5 OR 5HRUB5 5CAWM OR DESTROYED
<br />DESIGNATED TO REMAIN NRLL BE REPLACED AT THE CONTRACTORS
<br />=W5E, WITH 51MILAR SPECIES, 51ZE AND QUALITY.
<br />LANDSCAPE CONTRACTOR SMALL CONTACT THE COUNTY, CITY ANDIOK UMUTY COMPANIES
<br />TO LOCATE ALL LMOERIGROUND UTILITIES OR STRUCTURES PRIOR TO DIGGING.
<br />LANDSCAPE CONTRACTOR SHALL REPAIR ALL DAMAGE TO UNDERGROUND LITILITIE5,
<br />AND/OR CONSTRUCTION CAUSED BY UTILITY DAMAGE, AT NO C05T TO THE OWNER.
<br />ALL PLANT MATERIALS SMALL BE GUARANTEED FOR A PERIOD Of 12 MONTHS.
<br />AFTER DATE OF 5MTANTIAL COMPLETION.
<br />LANDSCAPE CONTRACTOR SMALL VERIFY ALL E5TIMATED QUANTITIES OF MATERIAL
<br />GOMPAGTED .`SUbC�RADE
<br />SHOWN ON THE DRAWINGS PRIOR TO SUBMITTING M15 BID. PLANTING PLAN TO
<br />6
<br />TAKE PRECEDENCE OVER PLANT UST.
<br />O.G.
<br />ALL AREAS DISTURBED DURING CONSTRUCTION SMALL BE 5ODDED UNU55
<br />IN.
<br />OTMERIM5E NOTED, If ..... SODDED, PAVED.
<br />5
<br />EX15TING PLANT MATERIAL NOT SHOWN ON THE PLAN AND IN CONFUCT WITH
<br />O.G.
<br />NEW PLANTING SHALL BE EVALUATED AT THE TIME OF NEW PLANTING INSTALLATION
<br />IN.
<br />BY THE LANDSCAPE ARCHITECT.
<br />10
<br />ALL BUILDING CON5TRLICITON MATERIAL AND FOREIGN MATERIAL SMALL BE REMOVED FROM
<br />D.G.
<br />PLANTING AREAS AND REPLACED WITH 8020 MIX FILL 501L OR AS PER 5MTIMCATION5.
<br />ALL ISLANDS IN PARKING LOTS AND AROUND BUILDING5, SKALI. BE EXCAVATED TO A
<br />DETAI4
<br />DEPTH OF 2 -1/2' MIN. AND REPLACED WTfH 8U20 PLANT MIX, OR AS FM 5PECIFICATION5.
<br />12
<br />ALL PLANTING BEDS 4 50DW AREAS SMALL. BE DEVOID OF ALL ROCKS 4 DEBRIS GREATER
<br />N.T.5.
<br />THAN I' DIAMETER, TO A DEPTH OF 2j FOR SHRUB BEDS 4 G' DEPTM FOR SODDED AREAS.
<br />IN.
<br />ALL PLANT MATERIAL 5YMBOL5 SHOWN ON LANDSCAPE PLAN SMALL BE CONSIDERED
<br />15
<br />DIAGRAMMATIC AND SHOULD BE ADJUSTED IN THE MELD BY CONTRACTOR TO AVOID ALL
<br />O.G.
<br />♦ ♦.... ♦•. «..r... ♦....
<br />IN.
<br />ALL 51ZE5 SHOWN FOR PLANT MATERIAL ON THE PLAN ARE TO BE CONSIDERED MINIMUM.
<br />15
<br />ALL PLANT MATERIAL MUST MEET OF EXCEED THESE MINIMUM REQUIREMENTS FOR BOTH
<br />♦ ♦ . ♦ ♦ .. + ♦ • + ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ r
<br />HEIGHT AND SPREAD. ANY OTHER REQUIREMENTS FOR 5PECIMC SHAPE OR EFFECT AS
<br />. ...
<br />NOTED ON THE PLAN SHAD. ALSO BE REQUIRED FOR ACCEPTANCE. ALL TREES TO BE
<br />Z;A
<br />♦+ ♦r+
<br />♦♦ ♦.�♦ ♦+ +
<br />♦•�♦ +
<br />♦♦+•♦++♦++
<br />D.G.
<br />SITE PREPARATION SMALL INCLUDE THE ERADICATION AND REMOVAL OF ANY WEEDS, GRA55,
<br />IN.
<br />CLEAN -UP OF ANY DEAD MATERIAL AND FIN15H GRADING AS PER THE SPECS.
<br />♦�+ +r+ ♦••♦r
<br />THE LANDSCAPE CONTRACTOR SHALL AT ALL TIMES KEEP THE JOB 51TE CLEAN AND FREE
<br />a
<br />FROM ACCUMULATION OF WASTE MATERIAL., DEBRI5, AND RU56I5M.
<br />IN.
<br />♦ + ♦ ♦ + + ♦ ♦ . . ♦ r . ♦ ♦ • + ♦ ♦ ♦ ♦ +
<br />36
<br />II
<br />D.G.
<br />THE ORIGINAL STATE BY THE LANDSCAPE CONTRACTOR AT NO ADDITIONAL C05T TO THE
<br />IN.
<br />OWNER.
<br />SOD PLANT
<br />ALL PLANT MATERIAL TO BE FLORIDA II I OR BETTER AS DEFINED BY THE FLORIDA DEFARTMENT
<br />D.G.
<br />OF AGRICULTURES'C M AND STANDARDS FOR NURSERY PLANTS CURRENT EDITION.
<br />03
<br />ALL GUYING.# STAKING SHAD. BE THE R15PON51DIUTY OF THE LAN=APE CONTRACTOR 4
<br />54
<br />ACCEPTABLE INDUSTRY STAKING METHODS SHALL PREVAIL.
<br />�:
<br />1
<br />IN.
<br />PL— DET -6.DWG
<br />60
<br />IRRIGATION 5Y5TEM SMALL BE AUTOMATIC, DESIGNED TO PROVIDE 100% COVERAGE,
<br />I'
<br />I!
<br />i
<br />i
<br />100% OVERLAP, MINIMIZE APPLICATION OF WATER TO IMPERVIOU5 AREAS AND
<br />IN.
<br />f
<br />i j
<br />j
<br />DATE
<br />PROVIDED AN IRRIGATION DE51GN ON A PLAN TO BE REVIEWED BY LANDSCAPE
<br />ARCHITECT IF NO IRRIGATION PUN 15 PART OF.THE BID SET.
<br />KNl
<br />TOPSOIL
<br />N.T.5.
<br />PRUNE 4 TIE FRONDS
<br />PROTECTIVE TREE
<br />15AN PING S— 2 X A
<br />(IS" LONG), EVENLY
<br />SPACED OVER FOUR
<br />LAYERS OF fIFLAP
<br />PADDING & 61564 TI?
<br />W/ f5ANDIN6.
<br />SUPPORT SrA <,E5 (A
<br />PER PALM) 2— 2 X A
<br />NAILED TOC -ETt EK
<br />NAIL SUPPORr TO
<br />PROrEGTIVE 15ANPING
<br />& REINF. W/ STEEL
<br />6Ti2APPIN6. WGLT
<br />SUPPORT TO LOWER
<br />P05TS. DO NOT
<br />NAIL TO TRUNK.
<br />6" DIAMETER OPEN AREA
<br />TOP OF ROOT PALL 107
<br />ADOVE LAW66APE SOIL
<br />3" APPROVED MJ-&H
<br />6" WERM
<br />FINISH GRADE
<br />60WA6TED 6Up6RADE
<br />SPECIFIED PLANTING SOIL
<br />LOWER P05T5
<br />(A PER PALM) 2 X A'S
<br />IV LON&
<br />0. 1/2 ROOT PALL,
<br />R 15 GREATER
<br />04 PALM STAKING DETAIL
<br />N.T.5. PL —DET —I (.DWG
<br />GENERAL PLANTING NOTES:
<br />ATM TO REMAIN SMALL BE PROTECTED DURING ALL
<br />PMASM. ANY TRM 5 OR 5HRUB5 5CAWM OR DESTROYED
<br />DESIGNATED TO REMAIN NRLL BE REPLACED AT THE CONTRACTORS
<br />=W5E, WITH 51MILAR SPECIES, 51ZE AND QUALITY.
<br />LANDSCAPE CONTRACTOR SMALL CONTACT THE COUNTY, CITY ANDIOK UMUTY COMPANIES
<br />TO LOCATE ALL LMOERIGROUND UTILITIES OR STRUCTURES PRIOR TO DIGGING.
<br />LANDSCAPE CONTRACTOR SHALL REPAIR ALL DAMAGE TO UNDERGROUND LITILITIE5,
<br />AND/OR CONSTRUCTION CAUSED BY UTILITY DAMAGE, AT NO C05T TO THE OWNER.
<br />ALL PLANT MATERIALS SMALL BE GUARANTEED FOR A PERIOD Of 12 MONTHS.
<br />AFTER DATE OF 5MTANTIAL COMPLETION.
<br />LANDSCAPE CONTRACTOR SMALL VERIFY ALL E5TIMATED QUANTITIES OF MATERIAL
<br />GOMPAGTED .`SUbC�RADE
<br />SHOWN ON THE DRAWINGS PRIOR TO SUBMITTING M15 BID. PLANTING PLAN TO
<br />6
<br />TAKE PRECEDENCE OVER PLANT UST.
<br />O.G.
<br />ALL AREAS DISTURBED DURING CONSTRUCTION SMALL BE 5ODDED UNU55
<br />IN.
<br />OTMERIM5E NOTED, If ..... SODDED, PAVED.
<br />5
<br />EX15TING PLANT MATERIAL NOT SHOWN ON THE PLAN AND IN CONFUCT WITH
<br />O.G.
<br />NEW PLANTING SHALL BE EVALUATED AT THE TIME OF NEW PLANTING INSTALLATION
<br />IN.
<br />BY THE LANDSCAPE ARCHITECT.
<br />10
<br />ALL BUILDING CON5TRLICITON MATERIAL AND FOREIGN MATERIAL SMALL BE REMOVED FROM
<br />D.G.
<br />PLANTING AREAS AND REPLACED WITH 8020 MIX FILL 501L OR AS PER 5MTIMCATION5.
<br />ALL ISLANDS IN PARKING LOTS AND AROUND BUILDING5, SKALI. BE EXCAVATED TO A
<br />DETAI4
<br />DEPTH OF 2 -1/2' MIN. AND REPLACED WTfH 8U20 PLANT MIX, OR AS FM 5PECIFICATION5.
<br />12
<br />ALL PLANTING BEDS 4 50DW AREAS SMALL. BE DEVOID OF ALL ROCKS 4 DEBRIS GREATER
<br />N.T.5.
<br />THAN I' DIAMETER, TO A DEPTH OF 2j FOR SHRUB BEDS 4 G' DEPTM FOR SODDED AREAS.
<br />IN.
<br />ALL PLANT MATERIAL 5YMBOL5 SHOWN ON LANDSCAPE PLAN SMALL BE CONSIDERED
<br />15
<br />DIAGRAMMATIC AND SHOULD BE ADJUSTED IN THE MELD BY CONTRACTOR TO AVOID ALL
<br />O.G.
<br />UTILITIES, AND ALL OTHER OBSTRUCTION5.
<br />IN.
<br />ALL 51ZE5 SHOWN FOR PLANT MATERIAL ON THE PLAN ARE TO BE CONSIDERED MINIMUM.
<br />15
<br />ALL PLANT MATERIAL MUST MEET OF EXCEED THESE MINIMUM REQUIREMENTS FOR BOTH
<br />O.G.
<br />HEIGHT AND SPREAD. ANY OTHER REQUIREMENTS FOR 5PECIMC SHAPE OR EFFECT AS
<br />IN,
<br />NOTED ON THE PLAN SHAD. ALSO BE REQUIRED FOR ACCEPTANCE. ALL TREES TO BE
<br />Z;A
<br />SINGLE TRUNKED, UNLE55 OTHERWISE NOTED ON THE PLANS.
<br />D.G.
<br />SITE PREPARATION SMALL INCLUDE THE ERADICATION AND REMOVAL OF ANY WEEDS, GRA55,
<br />IN.
<br />CLEAN -UP OF ANY DEAD MATERIAL AND FIN15H GRADING AS PER THE SPECS.
<br />30
<br />THE LANDSCAPE CONTRACTOR SHALL AT ALL TIMES KEEP THE JOB 51TE CLEAN AND FREE
<br />O.G.
<br />FROM ACCUMULATION OF WASTE MATERIAL., DEBRI5, AND RU56I5M.
<br />IN.
<br />THE LANDSCAPE CONTRACTOR SHALL EXERCISE CAUTION TO PROTECT ALL EXISTING 50D AND
<br />36
<br />IRRIGATION. ANY DAMAGE TO THE SOD OR IRRIGATION SMALL BE REPLACED OR REPAIRED TO
<br />D.G.
<br />THE ORIGINAL STATE BY THE LANDSCAPE CONTRACTOR AT NO ADDITIONAL C05T TO THE
<br />IN.
<br />OWNER.
<br />AS
<br />ALL PLANT MATERIAL TO BE FLORIDA II I OR BETTER AS DEFINED BY THE FLORIDA DEFARTMENT
<br />D.G.
<br />OF AGRICULTURES'C M AND STANDARDS FOR NURSERY PLANTS CURRENT EDITION.
<br />IN.
<br />ALL GUYING.# STAKING SHAD. BE THE R15PON51DIUTY OF THE LAN=APE CONTRACTOR 4
<br />54
<br />ACCEPTABLE INDUSTRY STAKING METHODS SHALL PREVAIL.
<br />O.G.
<br />MULCH ALL PLANTING AREA5.WITH SHREDDED MELALEUCA MULCH TO A MINIMUM 00" OF 3'.
<br />IN.
<br />ALL PLANTING AREAS WITHIN LIMIT OF WORK SHALL BE 1 0096 FULLY IRRIGATED.
<br />60
<br />IRRIGATION 5Y5TEM SMALL BE AUTOMATIC, DESIGNED TO PROVIDE 100% COVERAGE,
<br />O.G.
<br />100% OVERLAP, MINIMIZE APPLICATION OF WATER TO IMPERVIOU5 AREAS AND
<br />IN.
<br />INCLUDE A RAIN SENSOR. THE IRRIGATION CONTRACTOR AWARDED THE BID SHALL
<br />PROVIDED AN IRRIGATION DE51GN ON A PLAN TO BE REVIEWED BY LANDSCAPE
<br />ARCHITECT IF NO IRRIGATION PUN 15 PART OF.THE BID SET.
<br />Mo Can, "Idrlo it AMOd , hc.
<br />DATE 2/1/
<br />Dw►wN CrA ► 1800 mler Drive, suite Goo
<br />DATE 2/1/ Fort Lauderdale, Florids 99818
<br />CHECKED MD Phone. 954,9&.7781 Fez 954.981.8807
<br />DATE REVroM DATE 2/1/
<br />PLANT SPAGINC-) (A')
<br />ROW SPACING ('f5')
<br />6
<br />IN.
<br />O.G.
<br />5
<br />IN.
<br />O.G.
<br />5
<br />IN.
<br />O.G.
<br />7
<br />IN.
<br />D.G.
<br />10
<br />IN.
<br />D.G.
<br />S—I/2
<br />IN.
<br />O.G.
<br />12
<br />IN.
<br />O.G.
<br />I0—I /2
<br />IN.
<br />O.G.
<br />15
<br />IN.
<br />O.G.
<br />13
<br />IN.
<br />O.G.
<br />15
<br />IN.
<br />O.G.
<br />16
<br />IN,
<br />O.G.
<br />Z;A
<br />IN.
<br />D.G.
<br />21
<br />IN.
<br />O.G.
<br />30
<br />IN.
<br />O.G.
<br />26
<br />IN.
<br />D.G.
<br />36
<br />IN.
<br />D.G.
<br />30
<br />IN.
<br />O.G.
<br />AS
<br />IN.
<br />D.G.
<br />AZ
<br />IN.
<br />O.G.
<br />54
<br />IN.
<br />O.G.
<br />AS
<br />IN.
<br />O.G.
<br />60
<br />IN.
<br />O.G.
<br />54
<br />IN.
<br />0,6.
<br />SQUARE SI
<br />TRIANGULAR SPACING
<br />NOTE:
<br />THE TRIANGULAR? METHOD
<br />15 PREFERRED. USE
<br />SQUARE SPACING ONLY
<br />IN SMALL RECTILINEAR
<br />AREAS.
<br />TYP. PLANT SPACING
<br />PLANT LOCATIONS
<br />TYP. PLANT 5PAGING
<br />TYP. PLANT 5PAGIN6
<br />A5 I ND I GATED ON
<br />CONST. DRAWIN65.
<br />VARIES W/ PLANT
<br />SPECIES, SO THAT
<br />MATURE PLANTS WILL
<br />NOT OVERLAP ONTO
<br />SIDEWALK.
<br />PAVEMENT OR GRASS, FINAL
<br />(5RADE.
<br />TOP OF MULCH TO
<br />BE 1" BELOW PVMN'T.
<br />3" MULCH
<br />EXG VATE TO A MIN.
<br />DEPTH OF 12" 4
<br />BACJKFILL W/ PLANTING
<br />501L..
<br />EX151TING 501L
<br />�O5 R� GEC. /SHRUB SPACING CHART -06 106 R�i6G.C✓SHRUB SPACIN
<br />PLANT LIST
<br />6?TY. I SYM I BOTANICAL NAME I COMMON NAME
<br />PALMS:
<br />13
<br />CC
<br />Chamaedorea
<br />Cat
<br />Field grown; G -8' Ht.x 5' 5prd.
<br />cataractarum
<br />Palm
<br />2
<br />PR
<br />Phoenix
<br />Pygmy Date
<br />Field grown, G -7 Fit.
<br />roebelenu
<br />Palm
<br />SHRUBS & GROUNDCOVERS:
<br />CITY OF SUNNY ISLES BEACH
<br />TOWN CENTER PARK
<br />ENTRY SIGN
<br />PLANT LIST AND
<br />PLANTING DETAILS
<br />LAYOUT
<br />CALL 48 HOURS BEFORE YOU DIG IN FLORIDA
<br />IT'S THE LAW!.. "
<br />1- 800 - 432 -4770
<br />SUNSHINE STATE ONE CALL OF FLORIDA, INC.
<br />PRELIMINARl'l
<br />NOT FOR
<br />MICHAEL CONNER, L.A.
<br />AS NOTED
<br />PRO,lECT No
<br />CAD nLE
<br />5
<br />C I
<br />
|