Laserfiche WebLink
STORM WATER POLLUTION PREVENTION PLAN <br />SITE DESCRIPTION <br />GENERAL <br />3. BRUSH BARRIER WITH FILTER FABRIC: BRUSH BARRIER MAY BE USED <br />THE 67 CUBIC YARDS OF STORAGE AREA PER ACRE DRAINED DOES NOT <br />HAZARDOUS PRODUCTS <br />THESE PRACTICES ARE USED TO REDUCE THE RISKS ASSOCIATED WITH <br />* SILT FENCE WILL BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, TO <br />PROJECT NAME AND LOCATION: <br />NE 172nd STREET <br />C" 6iord�no l��ocistlsesi, lnc• <br />M:PIFLORIDA <br />`1800 Biller Drive, Suite I;oo <br />Fort Lauderdale, Florida 38316 <br />Phone: 954.921.7781 Fax 954.921.8807 <br />B cerclrioate of Quthorlsation 514 <br />BELOW DISTURBED AREAS SUBJECT TO SHEET AND RILL EROSION WHERE <br />APPLY TO FLOWS FROM OFFSITE AREAS AND FLOWS FROM ONSITE AREAS <br />HAZARDOUS MATERIALS. <br />SEE IF THE FABRIC IS SECURELY ATTACHED TO THE FENCE POSTS, AND <br />CITY OF SUNNY ISLES BEACH <br />THE CONTRACTOR SHALL AT A MINIMUM IMPLEMENT THE CONTRACTOR'S <br />ENOUGH RESIDUE MATERIAL IS AVAILABLE ON SITE. <br />THAT ARE EITHER UNDISTURBED OR HAVE UNDERGONE FINAL <br />TO SEE THAT THE FENCE POSTS ARE FIRMLY IN THE GROUND. <br />MIAMI, (DADE COUNTY). <br />REQUIREMENTS OUTLINED BELOW AND THOSE MEASURES SHOWN ON THE EROSION <br />STABILIZATION WHERE SUCH FLOWS ARE DIVERTED AROUND BOTH THE <br />* PRODUCTS WILL BE KEPT IN ORIGINAL CONTAINERS UNLESS THEY ARE NOT <br />+ THE SEDIMENT BASINS WILL BE INSPECTED FOR THE DEPTH OF SEDIMENT, <br />OWNER NAME AND ADDRESS: <br />CONTROL PLAN. IN ADDITION THE CONTRACTOR SHALL UNDERTAKE <br />4. LEVEL SPREADER: A LEVEL SPREADER MAY BE USED WHERE SEDIMENT- <br />DISTURBED AREA AND THE SEDIMENT BASIN. ANY TEMPORARY SEDIMENT <br />RESEALABLE• <br />AND BUILT UP SEDIMENT WILL BE REMOVED WHEN IT REACHES 10 <br />CITY OF SUNNY ISLES BEACH <br />ADDITIONAL MEASURES REQUIRED TO BE IN COMPLIANCE WITH APPLICABLE PERMIT <br />FREE STORM RUNOFF IS INTERCEPTED AND DIVERTED AWAY FROM THE <br />BASINS CONSTRUCTED MUST BE BACKFILLED AND COMPACTED IN <br />PERCENT OF THE DESIGN CAPACITY OR AT THE END OF THE JOB, <br />18070 COWNS AVENUE <br />SUNNY ISLES BEACH, FLORIDA 33160 <br />CONDITIONS AND STATE WATER QUALITY STANDARDS. DEPENDING ON THE NATURE <br />GRADED AREAS ONTO UNDISTURBED STABILIZED AREAS. THIS PRACTICE <br />ACCORDANCE WITH THE SPECIFICATIONS FOR STRUCTURAL FILL. ALL <br />* ORIGINAL LABELS AND MATERIAL SAFETY DATA WILL BE RETAINED, THEY <br />WHICHEVER COMES FIRST. <br />OF MATERIALS AND METHODS OF CONSTRUCTION THE CONTRACTOR MAY BE <br />APPLIES ONLY IN THOSE SITUATIONS WHERE THE SPREADER CAN BE <br />SEDIMENT .COLLECTED IN PERMANENT OR TEMPORARY SEDIMENT TRAPS <br />CONTAIN IMPORTANT. INFORMATION. <br />*DIVERSION DIKES/SWALES WILL BE INSPECTED AND ANY BREACHES <br />DESCRIPTION: <br />REQUIRED TO ADD FLOCCULANTS TO THE RETENTION SYSTEM PRIOR TO PLACING <br />CONSTRUCTED ON UNDISTURBED SOIL AND THE AREA BELOW THE LEVEL <br />MUST BE REMOVED UPON FINAL STABILIZATION. <br />BY <br />PROMPTLY REPAIRED. <br />PROJECT CONSISTS OF THE RECONSTRUCTION OF THE NE 172nd STREET <br />THE SYSTEM INTO OPERATION. <br />UP IS STABILIZED. THE WATER SHOULD NOT BE ALLOWED 70 RECONCENTRATE <br />* IF SURPLUS PRODUCT MUST BE DISPOSED OF, MANUFACTURER'S OR LOCAL <br />TO INCLUDE DRAINAGE SYSTEM. <br />AFTER RELEASE. <br />AND STATE RECOMMENDED METHODS FOR FOR PROPER DISPOSAL WALL BE <br />* TEMPORARY AND PERMANENT SEEDING AND PLANING WILL BE INSPECTED <br />FOLLOWED. <br />FOR BARE SPOTS, WASHOUT'S, AND HEALTHY GROWTH. <br />SEQUENCE OF MAJOR ACTIVITIES: <br />5. STOCKPILING MATERIAL NO EXCAVATED MATERIAL SHALL BE STOCKPILED <br />OTHER CONTROLS <br />PRODUCT SPECIFIC PRACTICES <br />* A MAINTENANCE INSPECTION REPORT WILL BE MADE AFTER EACH <br />SOIL DISTURBING ACTIVITIES <br />IN SUCH A MANNER AS TO DIRECT RUNOFF DIRECTLY OFF THE PROJECT <br />. <br />INSPECTION. A COPY OF THE REPORT FORM TO BE COMPLETED BY THE <br />SITE INTO ANY ADJACENT WATER BODY OR STORM WATER COLLECTION <br />THE FOLLOWING PRODUCT SPECIFIC PRACTICES WALL BE FOLLOWED ONSITE: <br />INSPECTOR IS ATTACHED. <br />SOIL DISTURBING ACTIVITIES WILL INCLUDE, CLEARING AND GRUBBING, <br />FACILITY. <br />WASTE DISPOSAL IF APPLICABLE): <br />PETROLEUM PRODUCTS <br />THE REPORTS WILL BE KEPT ON SITE DURING CONSTRUCTION AND <br />AVAILABLE UPON REQUEST TO THE OWNER, ENGINEER S ANY FEDERAL, <br />A STABILIZED CONSTRUCTION ENTRANCE, THE EXCAVATION FOR <br />dl NCF OF MAJOR ACTIVITIES: <br />ALL ONSITE VEHICLES WILL BE MONITORED FOR LEAKS AND RECEIVE <br />STATE OR LOCAL AGENCY APPROVING SEDIMENT AND AND EROSION <br />THE PROPOSED CULVERT CROSSING, CONSTRUCTION OF THE PROPOSED <br />THE PR P <br />ROADWAY AND DRAINAGE SYSTEM. <br />1. INSTALL EROSION AND SEDIMENT CONTROL MEASURES. <br />6. EXPOSED AREA LIMITATION: THE SURFACE AREA OF OPEN, RAW ERODIBLE <br />REGULAR PREVENTIVE MAINTENANCE TO REDUCE THE CHANCE OF <br />PLANS, OR STORM WATER MANAGEMENT PUNS.. <br />SOIL EXPOSED BY CLEARING AND GRUBBING OPERATIONS OR EXCAVATION <br />WASTE MATERIALS <br />LEAKAGE. PETROLEUM PRODUCTS WALL BE STORED IN TIGHTLY SEALED <br />THE REPORTS SHALL BE MADE AND RETAINED AS PART OF THE STORM <br />2. EXCAVATE EXISTING PAVEMENT AND SIDEWALKS. <br />AND FLUNG OPERATIONS SHALL BE MINIMIZED. <br />CONTAINERS WHICH ARE CLEARLY LABELED. ANY ASPHALT SUBSTANCES <br />WATER POLLUTION PREVENTION PLAN FOR AT LEAST THREE YEARS FROM <br />RUNOFF CURVE NUMBERS: CN <br />90 <br />3. COORDINATE WORK WITH UTILITY CONSTRUCTION BY OTHERS. <br />7. INLET PROTECTION: INLETS AND CATCH BASINS WHICH DISCHARGE <br />ALL WASTE MATERIALS EXCEPT LAND CLEARING DEBRIS SHALL BE <br />COLLECTED AND STORED IN A SECURELY UDDED METAL DUMPSTER. THE <br />USED ONSITE WILL BE APPLIED ACCORDING TO THE MANUFACTURER'S <br />THE DATE THAT THE SITE IS FINALLY STABILIZED AND THE NOTICE OF <br />TERMINATION IS SUBMITTED THE REPORTS SHALL IDENTIFY ANY INCIDENTS <br />1. PRE- CONSTRUCTION <br />2. DURING CONSTRUCTION 85 <br />4. CONSTRUCT DRAINAGE. SYSTEM <br />DIRECTLY OFF -SITE SHALL BE PROTECTED FROM SEDIMENT-LADEN STORM <br />DUMPSIER TILL MEET ALL LOCAL AND STALE SOLID WASTE MANAGEMENT <br />RECOMMENDATIONS. <br />OF NON - COMPLIANCE. <br />3. POST-CONSTRUCTION 93 <br />RUNOFF UNTIL THE COMPLETION OF ALL CONSTRUCTION OPERATIONS <br />REGULATIONS. THE OUMPSTER WALL BE EMPTIED AS NEEDED AND THE <br />FERTILIZERS <br />5. CONSTRUCT ROADWAY AND .DRIVEWAYS <br />THAT MAY CONTRIBUTE SEDIMENT TO THE INLET. <br />TRASH WILL BE HAULED TO A STATE APPROVED LANDFILL. ALL <br />FERTILIZERS USED WILL BE APPLIED ONLY IN THE MINIMUM AMOUNTS <br />* THE SITE SUPERINTENDENT WILL SELECT UP TO THREE INDIVIDUALS WHO <br />BLS' <br />REFER TO THE GE07ECHICAL REPORT <br />6. COMPLETE SIDEWALKS AND LANDSCAPE. <br />S. OUST CONTROL: AREAS OPENED BY CONSTRUCTION OPERATIONS <br />PERSONNEL WILL BE INSTRUCTED REGARDING THE CORRECT <br />RECOMMENDED BY THE MANUFACTURER. ONCE APPLIED, FERilUZER WALL <br />WILL BE RESPONSIBLE FOR INSPECTIONS, MAINTENANCE AND REPAIR <br />ACTIVITIES, AND FILLING OUT THE INSPECTION AND MAINTENANCE <br />7. REMOVE SEDIMENT FROM EXISTING DRAINAGE PIPES; AND EXISTING WELL <br />AND THAT ARE NOT ANTICIPATED TO BE RE- EXCAVATED OR DRESSED AND <br />PROCEDURE FOR WASTE DISPOSAL. NOTICES STATING THESE <br />BE WORKED INTO THE SOIL TO LIMIT EXPOSURE TO STORM WATER. <br />REPORT. <br />SITE MAPS: <br />REFER TO CONSTRUCTION PLANS <br />8. REMOVE EROSION AND SEDIMENT CONTROL MEASUIRES. <br />RECEIVE FINAL TREATMENT WITHIN 30 DAYS SHALL BE STABILIZED. <br />PRACTICES WILL BE POSTED AT THE CONSTRUCTION SITE BY THE <br />CONSTRUCTION SUPERINTENDENT, THE INDIVIDUAL WHO MANAGES <br />STORAGE WILL BE IN A COVERED AREA. THE CONTENTS OF ANY <br />PARTIALLY USED BAGS OF FERTILIZER WILL BE TRANSFERRED TO A <br />* PERSONNEL SELECTED FOR INSPECTION AND MAINTENANCE <br />9. TEMPORARY. SEEDING AND MULCHING: SLOPES STEEPER THAN 6:1 THAT <br />THE DAY -TO -DAY SITE OPERATIONS, WILL BE RESPONSIBLE FOR <br />SEALABLE PLASTIC BIN TO AVOID SPILLS. <br />RESPONSIBILITIES WALL RECEIVE TRAINING FROM THE SITE. <br />SUPERINTENDENT. THEY WALL BE TRAINED IN ALL THE INSPECTION AND <br />SITE AREA: <br />1. TOTAL AREA OWNED: 1.87 ACRES <br />FALL WITHIN THE CATEGORY ESTABLISHED IN PARAGRAPH 8 ABOVE <br />SEEING THAT THESE PROCEDURES ARE FOLLOWED. <br />PAINTS <br />MAINTENANCE PRACTICES NECESSARY FOR KEEPING THE EROSION AND <br />SHALL ADDITIONALLY RECEIVE MULCHING OF APPROXIMATELY 2 INCHES <br />SEDIMENT CONTROLS USED ONSITE IN GOOD WORKING ORDER, <br />LOOSE MEASURE OF MULCH MATERIAL CUT INTO THE SOIL OF THE SEEDED <br />ALL CONTAINERS WILL BE TIGHTLY SEALED AND STORED WHEN NOT <br />REQUIRED FOR USE. EXCESS PAINT WILL NOT BE DISCHARGED TO THE <br />AREA ADEQUATE TO PREVENT MOVEMENT OF SEED AND MULCH. <br />HAZARDOUS WASTE <br />STORM SEWER SYSTEM BUT WILL BE PROPERLY DISPOSED OF ACCORDING <br />NON -STORM WATER DISCHARGES <br />2, AREA TO BE DISTURBED: 1.90 ACRES <br />10. TEMPORARY GRASSING: THE SEEDED OR SEEDED AND MULCHED AREA(S) <br />ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED OF IN THE <br />TO MANUFACTURERS' INSTRUCTIONS OR STATE AND LOCAL REGULATIONS. <br />IT IS EXPECTED THAT THE FOLLOWING NON -STORM WATER DISCHARGES <br />TIMING OF CONTROLS/MEASURES <br />SHALL BE ROLLED AND WATERED OR HYDROMULCHED OR OTHER <br />MANNER SPECIFIED BY LOCAL OR STATE REGULATION OR BY THE <br />CONCRETE TRUCKS <br />WILL OCCUR FROM THE SITE DURING THE CONSTRUCTION PERIOD: <br />SUITABLE METHODS IF .REQUIRED TO ASSURE OPTIMUM. GROWING <br />MANUFACTURER. SITE PERSONNEL WALL BE INSTRUCTED IN THESE <br />CONCRETE TRUCKS WALL NOT BE ALLOWED TO WASH OUT OR DISCHARGE <br />CONDITIONS FOR THE ESTABLISHMENT OF A GOOD GRASS COVER. <br />PRACTICES AND THE SITE SUPERINTENDENT, THE INDIVIDUAL WHO <br />SURPLUS CONCRETE OR DRUM WASH WATER ON THE SITE. <br />* WATER FROM WATER LINE FLUSHING <br />NAME OF RECEIVING WATERS: <br />AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES, THE SILT <br />TEMPORARY GRASSING SHALL SE THE SAME MIX d: AMOUNT REQUIRED <br />MANAGES DAY -TO -DAY SITE OPERATIONS,WILL BE RESPONSIBLE FOR <br />* PAVEMENT WASH WATERS (WHERE NO SPILLS OR LEAKS OF TOXIC OR <br />PROJECT SITE IS A FULL RETENTION <br />FENCES AND HAY AND BALES, TURBIDITY BARRIERS, STABILIZED <br />CONSTRUCTION ENTRANCE AND SEDIMENT BASIN WILL BE <br />CONSTRUCTED PRIOR TO CLEARING OR .GRADING OF ANY OTHER <br />PORTIONS OF THE SITE. STABILIZATION MEASURES SHAILL BE INITIATED <br />AS SOON LAS PRACTICAL IN PORTIONS OF THE SITE WHERE <br />CONSTRUCTION ACTIVITIES HAVE IEMPORARILY OR PERMANENTLY <br />FOR PERMANENT GRASSING IN THE CONTRACT SPECIFICATIONS. <br />11. TEMPORARY REGRASSING : IF, AFTER 14 DAYS FROM SEEDING, THE <br />TEMPORARY GRASSED AREAS HAVE NOT ATTAINED A MINIMUM OF 75 <br />PERCENT GOOD GRASS COVER, THE AREA WILL BE REWORKED AND <br />SEEING THAT THESE PRACTICES ARE FOLLOWED. <br />SANITARY WASTE <br />ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE UNITS AS <br />SPILL CONTROL PRACTICES <br />HAZARDOUS MATERIALS HAVE OCCURRED . <br />) <br />*UNCONTAMINATED GROUNDWATER FR <br />(FROM DEWATERING EXCAVATION). <br />ALL NON- STORM WATER DISCHARGES WILL BE DIRECTED TO THE SEDIMENT <br />CONTROLS <br />IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT <br />PRACTICES DISCUSSED IN THE PREVIOUS SECTIONS OF THIS PLAN THE <br />THIS PLAN UTILIZES BEST MANAGEMENT PRACTICES TO CONTROL EROSION AND <br />TURBIDITY CAUSED BY STORM WATER RUN OFF. AN EROSION AND TURBIDITY <br />CEASED. ONCE CONSTRUCTION ACUITY CEASES PERMANENTLY IN AN <br />ADDITIONAL SEED APPLIED SUFFICIENT TO ESTABLISH THE DESIRED <br />NEEDED TO PREVENT POSSIBLE SPILLAGE. THE WASTE WALL BE COLLECTED <br />FOLLOWING PRACTICES WILL BE FOLLOWED FOR SPILL PREVENTION AND <br />BASIN PRIOR TO DISCHARGE. <br />PLAN HAS BEEN PREPARED TO INSTRUCT THE CONTRACTOR ON PLACEMENT <br />AREA, THAT AREA WILL BE STABILIZED PEIRMANENTLY IN <br />ACCORDANCE WITH THE PLANS. AFTER THE ENTIRE SITE IS .STABILIZED, <br />VEGETATIVE COVER. <br />AND DEPOSED OF IN ACCORDANCE WITH STATE AND LOCAL. WASTE DISPOSAL <br />CLEANUP: <br />OF THESE CONTROLS. IT IS THE CONTRACTORS RESPONSIBILITY TO INSTALL <br />THE ACCUMULATED SEDIMENT WILL BE REMOVED FROM THE SEDIMENT <br />REGULATIONS FOR SANITARY SEWER OR SEPTIC SYSTEMS. <br />AND MAINTAIN THE CONTROLS PER PLAN AS WELL AS ENSURING THE PLAN <br />HEAPS AND . THE EARTH DIKE /SWALES WILL BE REGRADED/REMOVED <br />12, MAINTENANCE: ALL FEATURES OF THE PROJECT DESIGNED AND <br />MANUFACTURERS' RECOMMENDED METHODS FOR SPILL CLEANUP WALL BE <br />CONTRACTOR'S CERTIFICATION <br />IS PROVIDING THE PROPER PROTECTION. AS REQUIRED BY FEDERAL, STATE <br />AND STANJZED IN ACCORDANCE WITH THE EROSIiON do TURBIDITY <br />CONTROL <br />CONSTRUCTED TO PREVENT EROSION AND SEDIMENT SHALL BE <br />OFFSITE VEHICLE TRACKING <br />CLEARLY POSTED ON SITE AND SITE PERSONNEL WALL BE MADE AWARE OF <br />AND LOCAL LAWS. REFER TO "CONTRACTORS RESPONSIBILITY FOR A WRITTEN <br />MAINTAINED DURING THE LIFE OF THE CONSTRUCTION SO AS TO <br />THE PROCEDURES AND THE LOCATION OF THE INFORMATION AND CLEANUP <br />I CERTIFY UNDER PENALTY OF LAW THAT i UNDERSTAND THE TERMS AND <br />DESCRIPTION OF THE CONTROLS ,THAT MAY BE IMPLEMENTED. <br />FUNCTION AS THEY WERE ORIGINALLY DESIGNED AND CONSTRUCTED. <br />A STABILIZED CONSTRUCTION ENTRANCE WALL BE PROVIDED TO HELP <br />SUPPLIES. <br />CONDITIONS OF THE GENERAL NATIONAL POLLUTANT DISCHARGE <br />REDUCE VEHICLE TRACKING OF SEDIMENTS. THE PAVED STREET ADJACENT <br />ELIMINATION SYSTEM (NPDES) PERMIT THAT AUTHORIZES THE STORM WATER <br />ENDANGERED SPECIES AND CRITICAL HABIITAT <br />STORM WATER MANAGEMENT <br />13. PERMANENT EROSION CONTROL: THE EROSION CONTROL FACILITIES OF <br />TO THE SITE ENTRANCE WILL BE SWEPT AS NEEDED TO REMOVE ANY EXCESS <br />MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT <br />DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY FROM THE <br />THE PROJECT STORM WATER MANAGEMENT SYSTEM IS BASED ON <br />THE PROJECT SHOULD BE DESIGNED TO MINIMIZE THE IMPACT ON THE <br />MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS HAULING <br />IN THE MATERIAL STORAGE AREA ONSITE. EQUIPMENT AND MATERIALS WILL <br />CONSTRUCTION SITE IDENTIFIED AS PART OF THIS CERTIFICATION. <br />THE EXISTING DRAINAGE WELL. <br />1, ' W�TDANGERED SPECIES ON SITE? NO <br />OFFSITE FACILITIES. <br />MATERIAL FROM THE CONSTRUCTION SITE WILL BE COVERED WITH A <br />INCLUDE BUT NOT BE LIMITED TO BROOMS, OUST PANS, MOPS, RAGS, <br />2. ARE THERE CRITICAL HABITAT ON SITE? No <br />14. PERMANENT SEEDING: ALL AREAS WHICH HAVE BEEN DISTURBED BY <br />TARPAULIN. <br />GLOVES, GOGGLES, LIQUID ABSORBENT (i.e. KITTY UTTER OR EQUAL), <br />IF YES TO EITHER QUESTION, PLEASE EXPLAIN, <br />CONSTRUCTION WILL, AS A MINIMUM, BE SEEDED. THE SEEDING MIX MUST <br />PROVIDE BOTH LONG -TERM VEGETATION AND RAPID GROWTH SEASONAL <br />SAND, SAWDUST, AND PLASTIC AND METAL TRASH CONTAINERS SPECIFICALLY <br />FOR THIS PURPOSE. <br />FOR THE PROJECT. AREAS WHICH ARE NOT TO BE CONSTRUCTED ON, BUT <br />INVENTORY FOR POLLUTION PREVENTION PLAN <br />WILL BE REGRADED SHALL STABILIZED IMMEDIATELY AFTER GRADING IS <br />VEGETATION. SLOPES STEEPER THAN 4:1 SHALL BE SEEDED AND MULCHED <br />ALL SPILLS WILL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY. <br />COMPLETE, WHEN CONSTRUCTION IS COMPLETE, A TOTAL OF 0.90 ACRE MALI. <br />OR SODDED. <br />THE MATERIALS OR SUBSTANCES LISTED BELOW ARE EXPECTED TO BE <br />v <br />< <br />BE REGRADED. FLOATING TURBIDITY BARRIERS WILL <br />STRUCTURAL PRACTICES (IF APPLICABLE): <br />PRESENT ONSITE DURING CONSTRUCTION: <br />THE SPILL AREA WILL BE KEPT WELL VENTILATED AND PERSONNEL WILL <br />ix <br />BE USED TO INTERCEPT SEDIMENT BEFORE ENTERING THE OFFSITE <br />CONTROLS <br />WEAR APPROPRIATE PROTECTIVE CLOTHING TO PREVENT INJURY FROM <br />DRAINAGE SYSTEM. THIS IS IN ACCORDANCE WITH THE REQUIREMENTS SET <br />1. TEMPORARY DIVERSION DIKE: TEMPORARY DIVERSION DIKES MAY BE <br />X❑ Concrete © Fertilizers © Wood <br />CONTACT WITH A HAZARDOUS SUBSTANCE. <br />IT IS THE CON'TIR►CTORS RESPONSIBILITY TO IMPLEMENIT THE EROSION AND <br />FORTH BY FEDERAL, STATE AND LOCAL REGULATIONS. <br />TURBIDITY CONTROLS AS.SHOWN ON THE GRADING, ORtAINAGE dt EROSION <br />THE <br />USED TO DIVERT RUNOFF THROUGH A SEDIMENT- TRAPPING FACILITY, <br />©Asphalt Petroleum Based Products ®Masonr Blocks <br />% <br />ss <br />CT <br />CONTROL PLAN, IT IS. ALSO CONTRACTORS RESPONISIBILITY TO ENSURE <br />� <br />SPILL OF TOXIC OR HAZARDOUS MATERIAL WILL BE REPORTED TO THE <br />z <br />THESE CONTROLS. ARE PROPERLY INSTALLED, MAINTAINED AND FUNCTIONING <br />PROPERLY TO PREVENT TURGID OR POLLUTED 'WATER 1 FROM LEAVING THE <br />X❑ Tar Q Cleaning Solvents Q Roofing Materials <br />APPROPRIATE STATE OR LOCAL GOVERNMENT AGENCY, REGARDLESS OF THE <br />TIMING OF CONTROLS /MEASURES <br />PROJECT SITE. THE CONTRACTOR WILL ADJUST THE EROr" AND TURBIDITY <br />2 TEMPORARY SEDIMENT WRAP: A SEDIMENT TRAP SHALL BE INSTALLED IN <br />® Detergents ® Paints ® Metal Studs <br />SIZE OF THE SPILL. <br />CONTROLS SHOWN ON THE GRADING, DRAINAGE & EROSION I CONTROL PLAN AND <br />A DRAINAGE WAY AT A STORM DRAIN INLET OR AT OTHER POINTS OF <br />REFER TO " CONTRACTORS RESPONSIBILITY FOR THE TIMING OF <br />ADD ADDITIONAL CONTROL MEASURES, AS REQUIRED, T(O ENSURE THE SITE <br />MEETS ALL FEDERAL, STATE AND LOCAL EROSION. AND TURBIDITY CONTROL <br />DISCHARGE FROM A DISTURBED AREA. <br />- --- -_- --__�_ -- -- <br />THE SPILL PREVENTION PLAN WILL BE ADJUSTED TO INCLUDE MEASURES TO <br />CONTROL /MEASURES. <br />REQUIREMENTS, THE FOLLOWING BEFIT MANAGEMENT IPRACTICES WILL BE <br />THE FOLLOWING SEDIMENT TRAPS MAY BE CONSTRUCTED EITHER <br />PREVENT THIS TYPE OF SPILL FROM REOCCURRING AND HOW TO CLEAN UP <br />IMPLEMENTED BY THE CONTRACTOR AS REQUIRED BY THE GRADING, DRAINAGE & <br />EROSION CONTROL PLAN AND AS REQUIRED TO MEET' THE EROSION AND <br />TURBIDITY REQUIREMENTS IMPOSED ON THE PROJECT SITE ISY T!# REGULATORY <br />INDEPENDENTLY OR IN CONJUNCTION WITH A TEMPORARY DIVERSION <br />DIKE: <br />SPILL PREVENTION <br />THE. SPILL IF THERE IS ANOTHER ONE. A DESCRIPTION OF. THE SPILL, WHAT <br />CAUSED IT, AND THE CLEANUP MEASURES WILL ALSO BE INCLUDED. <br />CERTIFICATION OF COMPLIANCE WITH <br />MATERIAL MANAGEMENT PRACTICES <br />FEDERAL, STATE AND LOCAL REGULATIONS <br />AGENCIES. <br />A. BLOCK d: GRAVEL SEDIMENT FILTER - THIS PROTECTION IS <br />APPLICABLE WHERE HEAVY FLOWS AND /OR WHERE AN OVERFLOW <br />THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT WILL BE <br />THE SITE SUPERINTENDENT RESPONSIBLE FOR THE DAY -TO -DAY SITE <br />IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL LAWS RELATED TO STORM <br />CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PON DNG AROUND <br />USED TO REDUCE THE RISK OF SPILLS OR OTHER ACCIDENTAL EXPOSURE OF <br />OPERATIONS, WILL BE THE SPILL PREVENTION AND CLEANUP COORDINATOR. <br />WATER MANAGEMENT AMID EROSION AND TURBIDITY CONTROLS, THE FOLLOWING <br />THE STRUCTURE. <br />MATERIALS AND SUBSTANCES TO STORM WATER RUNOFF. <br />HE /SHE WILL DESIGNATE AT LEAST ONE OTHER SITE PERSONNEL WHO <br />PERMITS HAVE BEEN OBTAINED <br />EROSION AND SEDIMENT CONTROLS <br />WILL RECEIVE SPILL PREVENTION AND CLEANUP TRAINING. THESE <br />SFWMD PERMIT # <br />STABILIZATION PRACTCEs (IF APPLICABLE): <br />B. GRAVEL SEDIMENT TRAP -THIS PROTECTION IS APPLICABLE WHERE <br />GOOD HOUSEKEEPING <br />INDIVIDUALS WILL EACH BECOME RESPONSIBLE FOR A PARTICULAR PHASE <br />� <br />z v <br />HEAVY CONCENTRATED FLOWS ARE EXPECTED, BUT NOT WHERE <br />THE FOLLOWING GOOD HOUSEKEEPING PRACTICES WILL BE FOLLOWED ONSITE <br />OF PREVENTION AND CLEANUP. THE NAMES OF RESPONSIBLE SPILL <br />NPOES PERMITS <br />1. HAY BALE BARRIER: HAY BALE BARRIERS CAN K USED BELOW DISTURBED <br />PONDING AROUND THE STRUCTURE MIGHT CAUSE EXCESSIVE <br />DURING THE CONSTRUCTION PROJECT. <br />PERSONNEL WALL BE POSTED IN THE MATERIAL STORAGE AREA AND IF <br />AREAS SUBJECT TO SI T AND RILL FRONTON WITH THE FOLLOWING UMITATIONS: <br />INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES & UNPROTECTED <br />APPLICABLE,. IN THE OFFICE TRAILER ONSITE. <br />v <br />A. WHERE THE MAXIMUM SLOPE 'NIEHIND'THE 13ARFRIER IS 33 PERCENT. <br />AREAS. <br />* AN EFFORT WALL BE MADE TO STORE ONLY ENOUGH PRODUCT REQUIRED TO <br />POLLUTION PREVENTION PLAN CERTIFICATION <br />B. N MINOR SWALIS OR DITCH LIMES WHEK .THE MAXIMUM CONTRIBUTING <br />DRAINAGE AREA IS NO GREATER THAN 2 ACRES. <br />C. DROP INLET SEDIMMT TRAP - THIS PROTECTION IS APPLICABLE WHERE <br />DO THE JOB. <br />MAINTENANCE/INSPECTION PROCEDURES <br />I CERTIFY UNDER PENALIY'OF LAW THAT THIS DOCUMENT AND ALL <br />C. WHERE EFFECNENESS IS REQUIRED FOR LESS THAN 3 MONTHS. <br />THE INLET DRAINS A RELATIVELY FLAT AREA (S < SX) AND WHERE <br />* ALL MATERIALS STORED ONSITE WILL BE STORED IN A NEAT, ORDERLY <br />ATTACHMENTS WERE PREPARED UNDER MY DIRECTION OR SUPERVISION IN <br />0. EVERY EFFORT SHODU) BE MADE TO LIMIT THE IUSE OF STRAW BALE <br />SHEET OR OVERLAID FLOWS (Q < 0.5 CFS) ARE TYPICAL. THIS METHOD <br />MANNER IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A <br />EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES <br />ACCORDANCE WITH A SYSTEM DEIGNED TO ASSURE THAT QUALIFIED <br />BARRIERS CONSTRUCTED IN LIVE STREAMS ORt IN SWALES WHERE <br />SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS SUCH <br />ROOF OR OTHER ENCLOSURE. <br />THE FOLLOWING ARE INSPECTION AND MAINTENANCE PRACTICES THAT WILL BE <br />PERSONNEL PROPERLY GATHERED AND EVALUATED THE INFORMATION <br />THERE IS THE. 0OSSIBIUTY OF A WASHOUT. IF NECESSARY, MEASURES <br />AS IN STREET OR HIGHWAY MEDIANS. <br />USED TO MAINTAIN EROSION AND SEDIMENT CONTROLS. <br />SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS WHO <br />SHAD. BE TAKEN TO PROPERLY ANCHOR BALES TO INSURE AGAINST <br />*PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE ORIGINAL <br />MANAGE THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR <br />WASHOUT. <br />ORIGINAL MANUFACTURERS LABEL <br />NO MORE THAN 5 ACRES OF THE SITE WILL BE DENUDED AT ONE TIME <br />GATHERING THE INFORMATION, THE NNFORNATION SUBMITTED 1% TO THE <br />REFER TO EROSION CONTROL DETAILS FOR, CONSIRUC:TNG THE HAY BALE <br />3. INLET AND OUTLET PROTECTION: APPLICABLE TO THE OUTLET OF THE CULVERT <br />WITHOUT WRITTEN PERMISSION FROM THE (ENGINEER. <br />BEST OF MY KNOWLEDGE AND BELIEF, 1RUL ACCURATE, AND COI�LEIE. I <br />BARRIER. ALSO RIFER TO THE GRADING.- DRAINAGE & EROSION CONTROL <br />AND CHANNEL SECTIONS WHERE THE FLOW COULD CAUSE EROSION <br />WATER <br />* SUBSTANCES WILL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED <br />ALL CONTROL MEASURES WILL BE INSPECTED BY THE SUPERINTENDENT, <br />AM AWARE THAT THERE ARE SICNFICANT PENALTIES FOR SUBMITTING FALSE <br />PLAN FOR PROPER LOCATION <br />& SEDIMENT PROBLEM TO THE BODY. TUBIDITY BARRIERS <br />BY THE MANUFACTURER. <br />THE PERSON RESPONSIBLE FOR THE DAY TO DAY SITE OPERATION OR <br /><_ <br />INFORMATION, INCLUDING THE POSSIBILITY OF FINE AND IMPRISONMENT FOR <br />2. SILT FENCE' <br />ARE TO BE INSTALLED UPSTREAM AND DOWNSTREAM OF WIRE CONTROL <br />SOMEONE APPOINTED BY THE SUPERINTENDENT AT LEAST ONCE A WEEK AND <br />tG�f <br />KNOWING VIOLATIONS. <br />A. USE PRINCIPALLY IN AREAS WHERE SHEET OR RILL FLOW OCCURS. <br />STRUCTURE AND CULVERT CROSSINGS AS SHOWN ON THE PLANS. <br />* WHENEVER POSSIBLE, ALL OF A PRODUCT WILL BE USED UP BEFORE DISPOSING <br />FOLLOWING ANY STORM EVENT OF M25 INCHES OR GREATER. <br />S. INSTALL ALONG A LEVEL CONTOUR, 90 WAIER DOES INOT POND MORE THAN <br />4. SEDIMENT BASIN: WILL BE CONSTRUCTED AT THE COMMON DRAINAGE <br />OF THE CONTAINER. <br />ALL TURBIDITY CONTROL MEASURES WILL BE MAINTAINED IN GOOD WORKING <br />1.5 FEET AT ANY POINT. <br />LOCATIONS, THE PROPOSED STORM WATER PONDS (OR TEMPORARY <br />ORDER., IF A REPAIR IS NECESSARY, IT WILL BE INITIATED WITHIN 24 HOURS OF <br />C. NO MORE THAN 1 ACHES, 100 FT., OR Q5 ofs OF CONCIENIRAIED FLOW SHOULD <br />PONDS) WALL BE CONSTRUCTED FOR USE AS SEDIMENT BASINS. THESE <br />' MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL WALL <br />REPORT. <br />DRAIN TO ANY POINT ALONG THE SILT FENCE. <br />SEDIMENT BASINS MUST PROVIDE A MINIMUM OF 67 CUBIC YARDS OF <br />BE FOLLOWED. <br />D. AM ENDS- OF FENCE UPHILL: <br />STORAGE PER ACRE DRAINED UNTIL FINAL STABILIZATION OF THE SITE. <br />BUILT UP SEDIMENT WALL BE REMOVED FROM SILT FENCE WHEN IT HAS <br />E. PROVIDE AREA 8E4NND THE FENIX FOR RUNOFF 701 POND AND SEDIMENT <br />THE VOLUME OF THE BASIN AT CLEAN OUT SHALL BE 22 CUBIC <br />* THE SITE SUPERINTENDENT WILL INSPECT DAILY TO ENSURE MATERIALS ONSITE <br />REACHED ONE -THIRD THE HEIGHT OF THE FENCE. <br />TO SETTLE. <br />YARDS PER ACRE. <br />RECEIVE PROPER USE AND DISPOSAL. <br />F. SELECT FL1ER FABRIC WHICH RETAN -85 PERCENT OF THE .SOIL, BY HEIGHT <br />BASED ON SIEVE ANALYSIS, OJT IS NOT FINER THAN EOS70. <br />- <br />DESIGNED /20 <br />DATE 02/2007 <br />C" 6iord�no l��ocistlsesi, lnc• <br />M:PIFLORIDA <br />`1800 Biller Drive, Suite I;oo <br />Fort Lauderdale, Florida 38316 <br />Phone: 954.921.7781 Fax 954.921.8807 <br />B cerclrioate of Quthorlsation 514 <br />CITY OF SUNNY ISLES BEACH, FL <br />NE 172nd STREET <br />ROADWAY I M' R 0 VE ME N T S <br />STORM WATER POLLUTION <br />PREVENTION NOTES <br />APPROVED., JOHN <br />REGISTRATION No. 47810 <br />�,,�. <br />SCALE N .T. s <br />SHEET <br />0401 <br />OF 23 <br />_ -- <br />[NO <br />��" 02/2007 <br />PROJECT Nc <br />03- 4.19 <br />CHECKED JM <br />DATE 02/2007 <br />CAD FILE <br />03- 4197- C400- C205- ER0S.DWG <br />- <br />DATE <br />RNIS�N <br />BY <br />NO <br />DATE <br />REVISION <br />BY <br />