My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
plans
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 6:25:53 AM
Creation date
2/18/2011 9:43:10 AM
Metadata
Fields
Template:
Building-Address Files SIB
Department (BLDG)
Building
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE INVESTIGATION NOTES <br />1. SITE INVESTIGATION: <br />EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF WORK: THE BIDDER IS REQUIRED, BEFORE SUBMITTING HIS PROPOSAL, TO <br />VISIT THE SITE OF THE PROPOSED WORK AND FAMILIARIZE HIMSELF /HERSELF WITH THE NATURE AND EXTENT OF THE WORK <br />AND ANY LOCAL CONDITIONS THAT MAY IN ANY MANNER AFFECT THE WORK TO BE DONE AND EQUIPMENT, MATERIALS AND <br />LABOR REQUIRED THEREFORE. SINCE THE WORK INVOLVES EXISTING BUILDINGS, SYSTEM AND FACILITIES, SPECIAL CONSIDERATION <br />SHALL BE GIVEN TO EXAMINATION OF WORKING CONDITIONS, EXISTING FACILITIES AND ALL BUILDING STRUCTURES TO <br />FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS. VARIATIONS IN ROUTING AND /OR CONSTRUCTION SHOULD BE ANTICIPATED <br />BY THIS CONTRACTOR AND ARE EXPRESSLY INCLUDED AS PART OF THE WORK WHENEVER REQUIRED AT NO ADDITIONAL COST <br />TO THE OWNER. IGNORANCE ON THE PART OF THE CONTRACTOR WILL IN NO WAY RELIEVE HIM OF THE OBLIGATION AND <br />RESPONSIBILITIES ASSUMED _UNDER THIS CONTRACT. <br />2. THE NATURE OF THE REMODEL TYPE CONSTRUCTION POSES SPECIAL PROBLEMS FOR THE DESIGN ENGINEERS AS WELL AS <br />THE PLUMBING CONTRACTOR. EVERY EFFORT HAS BEEN MADE BY THE ENGINEERS TO SHOW AND IDENTIFY THE LOCATIONS AND <br />TYPES OF EXISTING PLUMBING SYSTEMS. THE MAJOR PORTION OF THE PLUMBING SYSTEMS ARE AS SHOWN ON THE DRAWINGS <br />HOWEVER DEVIATIONS MAY BECOME EVIDENT AS THE JOB PROGRESSES. PLUMBING CONTRACTOR SHALL PERFORM AFIELD <br />VERIFICATION BEFORE BIDDING THIS PROJECT, <br />APPROVED FOR BUILDING <br />PERMITTING PURPOSES BY <br />MIAMI-DADE COUNTY FIRE <br />DEPARTMENT <br />IRE _ROTECT >ND /OR FIRE ALARM <br />WQ>RK11�ta'P�tNS SHALL BE SUBMITTED FOR <br />APPROVAL TO MIAMI -DADE FIRE DEPARTMENT <br />BEFORE ANY FIRE PROTECTION /FIRE ALARM <br />IS INSTALLED OR REMODELED. . <br />DATE: <br />0 <br />0 <br />z <br />PR04ECT NORTH <br />{ <br />i <br />Ll <br />L� <br />P" <br />1 <br />Y-4) <br />U <br />LL <br />> <br />o <br />r* � <br />�- ° <br />� in <br />
The URL can be used to link to this page
Your browser does not support the video tag.