My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Metric Engineering #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
Metric Engineering #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 11:19:25 AM
Creation date
2/18/2011 11:17:44 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
P.E.
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br /> <br />South Florida. Our mission is to provide our clients with the personal service and <br />attention they would receive from a smaller firm, while delivering the experience and <br />resources of a national firm. <br /> <br />As a full service transportation engineering firm, we have the capabilities in-house to <br />perform all the requisite engineering tasks to take a project from paper to pavement. At <br />the planning phase we perform Transportation Statistics Studies, Travel Demand <br />Forecasting, Land Use evaluations and comprehensive plan amendment reviews. In <br />addition, we can take this information and advance the project into the Project <br />Development and Environment phase where we perform more detailed studies to <br />ensure we have a permitable and constructable project before it advances into the final <br />design stage. By understanding the genesis of the project, we can deliver roadway and <br />civil final design plans that are comprehensive in nature, and are sensitive to the work <br />performed during previous project phases to arrive to that point. We have civil design <br />expertise throughout the state of Florida and in particular in South Florida where we <br />have had a number of municipal repeat clients such as City of Miami and City of <br />Homestead. Once the design is completed, we have the expertise and experience in <br />performing post-design services such as responding and documenting RFI's, Criteria <br />Package preparation and construction oversight as well. <br /> <br />Besides our extensive roadway and bridge design qualifications, ENR (Engineering <br />News-Record) ranked Metric 4ih among the Top 100 Construction Management Firms <br />in the entire country. Our growth from No. 53 was made possible by the outstanding <br />quality and commitment of our CEI staff of over 200 engineers, inspectors and <br />administrators. Additionally, the Florida Transportation Monthly ranked Metric 2nd in <br />Construction Engineering Inspection contracts awarded in Fiscal Year 2005/06. <br /> <br />Metric Engineering has been providing emergency debris removal services since <br />Hurricane Andrew in 1992. During the 2004 and 2005 record storm season, Metric <br />managed over $100 million dollars in emergency debris removal contracts for the <br />Florida Department of Transportation that included extensive coordination with FHW A, <br />FEMA and various local governments. Because of this experience, we understand first- <br />hand the critical issues to clearing and removing debris in a quick and efficient manner, <br />ensuring public safety, and restoring normalcy to the citizens of the City of Sunny Isles <br />Beach, while adhering to federal guidelines to ensure maximum reimbursement from <br />participating federal agencies. Over 100 of our employees have significant and recent <br />hurricane debris removal experience and our well qualified and responsive <br />subconsultants add to the available staff. <br /> <br />Current Workload/Client References <br /> <br />Project Name: SR-836/1-395 PD&E Study - SA#3 <br />Client: FDOT - District VI Contact: Vilma Croft, PE (305)470-5240 <br />Metric Fee: $1,622,427 <br />Pending Amount: $796,202 <br />Professional & Technical Staff: Robert Linares, PE, Sijong Jo, Ph.D., Alfredo Sainz, <br />PE, Julieta Rivero, EI, Carlos Rodriguez, EI, Ramon Navarro, Alejandro Vila <br /> <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.