Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />.. <br />'. <br />I. <br />I <br />I. <br />I. <br />. <br />. <br />,. <br />I <br />.. <br />I. <br />I <br />I. <br />. <br />. <br />. <br />. <br />.. <br />. <br />. <br />. <br />. <br />. <br />10 <br /> <br />RFQ 07-07-01 <br />General Engineering Consultant <br /> <br />Addendum 6 <br /> <br />Q: In reference to this RFQ, since the limit is 15 pages does that include the <br />information on our sub consultants or are you only asking for the Prime's <br />information? <br />A: There is no need for subs. We are only interested in the services each firm <br />can provide in-house. We are not looking for the total package from one <br />firm, there will be multiple awards. <br /> <br />Q: On Section 1.6, item #6 is requesting a list of all key personnel including <br />qualifications and experience, are you asking for a resume in addition to the <br />resumes contained in SF 255? <br />A: No. <br /> <br />RFQ_ 07 -07-01_ General_ Engineering_ Consultants.Addendum6.DOC <br />