My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
The Corradino Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 3:28:37 PM
Creation date
2/18/2011 3:22:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
p.e.
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />'. <br />I. <br />e <br />'. <br />I. <br />I. <br />I. <br />Ie <br />I. <br />. <br />. <br />. <br />,. <br />Ie <br />I. <br /> <br />. <br />'. <br />'. <br />'. <br />'e <br />. <br />. <br />I: <br /> <br />o <br />z <br />- <br />c <br />< <br />0:: <br />0:: <br />o <br />U <br /> <br />I" <br /> <br />QNQC procedures will be followed, as appropriate, for each stage of design plan submittal. The <br />objective of the QNQC program will be to ensure that our services are based on sound <br />engineering principles and practices that reflect the highest standards of design and to ensure that <br />our deliverables conform to the scope and are void of errors and omissions. Quality control is <br />assured by a carefully designed system of cross-checks and independent reviews, and senior <br />principals of the firm conduct top-level reviews of all projects in their role as quality <br />assurance/quality control advisors. <br /> <br />Corradino design excellence is complemented by our expertise in program and construction <br />management. Corradino has successfully managed many construction projects for the public <br />sector, often under critical time pressures involving complicated decision-making. Through our <br />management services we have met budget, time, quality and reporting requirements of federal, <br />state and local government projects. Corradino is a full service program/construction management <br />firm capable of providing experienced managers and staff in all areas of construction. Our depth <br />of resources and skill base can provide the City with all the program or construction management <br />services necessary to successfully manage the civil and structural engineering construction projects. <br /> <br />A list of projects illustrating the services Corradino provides is presented in the following table. <br /> <br />Project Contact Information <br />Palmetto Bay, T ransoortation Plannina, Civil EnQineerina Corrice Patterson 305-259- 1234 <br />Hialeah General Enaineerina Services JorQe Hernandez 305.687.2668 <br />Cutler Bay General Services Don O'Donniley 305.234.4262 <br />Palmetto Bay Transportation Master Plan Ron Williams 305-259-1234 <br />Miami Gardens T ransoortation Master Plan Jay Marder 305.622.8025 <br />Coastal Communities Transportation Master Plan Fernando Vasquez 305-673-7000 <br />Doral Transportation Master Plan SerQio Purrinos 305.593.6725 <br />Doral Transportation General Enqineerinq Serqio Purrinos 305.593.6725 <br />Miami Beach Parkinq Analysis Fernando Vasquez 305-673-7000 <br />FDOT D6 General Services Aileen Boucle 305-470-5201 <br />FDOT D4 General Services T racY Campbell <br />Miami Dade MPO General Services Larrv Foutz 305.375.2800 <br />Miami Dade Transit General Services David Fialkoff 305.770.3131 <br />Reqional Transportation Authority General Services Suzie Laducier <br />Hialeah EnQineerinQ General Services Jorqe Hernandez 305.687.2668 <br />Palmetto Bay Traffic Calminq Ron Williams 305-259- 1234 <br />Hialeah Gardens Annexation Mirtha Gonzales 305.558.4114 <br />Miami Gardens Transportation Element Jay Marder 305.622.8025 <br />DERM Sanitary Sewer Evaluation Survey Miami Dade County Public Schools <br />(SSES) Compliance Plan 2050 NW 43rd Terrace <br /> Miami, FL 33142 <br /> 305.995.1000 <br />Miami Beach General Services Contract Fernando Vasquez 305.673.7000 <br />North East Miami Dade Traffic Flow Study Andrea Henerv <br />Palmetto Bay Traffic Circle Desiqn / Construction Ron Williams 305-259- 1234 <br />Continuing Engineering Services, Roadway and Stormwater FDOT District VI <br />Drainage Planning and Design 1100 NW 111 th Avenue <br />City of Hialeah, FL Miami FL 331 72 <br /> Ernest Horselv 305.687.2668 <br /> <br />'13' <br />Il.I <br />\!) <br />< <br />a. <br />
The URL can be used to link to this page
Your browser does not support the video tag.