Laserfiche WebLink
<br />o <br /> <br /> <br />Vr-()ject Vr-()file~ <br /> <br />~ <br /> <br /> <br />OF GOLDEN BEACH <br /> <br />~1 iIII'~ <br />'.,' . ,~ ~. . ,., i <br />;- ,:. ~r-=--- .,-1 1. <br />--::::'.'-~\_- I~~;-'-'- :! "._ _~.. <br />.:,.'~.~,.,;;"'1ff:~~,,,,.,wrt~jl:i~~\1i~JJr~: <br />---~ ':'-~='::"-"~"" ..~~ 'I <br /> <br />~==-"""f'&MI ~ I <br /> <br />MASTER PLAN EXERPT <br /> <br />DESIGN PLAN EXCERPT <br /> <br /> <br />. <br /> <br />PROJECT DESCRIPTION: <br /> <br />STORMWATER MASTER PLAN UPDATE <br /> <br />Town of Golden Beach <br />One Golden Beach Drive <br />Golden Beach, Florida 33160-2296 <br /> <br />Alexander Diaz, Town Manager <br />(305) 932-0744 <br />E-mail: bwilbanks-free@townofgoldenbeach.org <br /> <br />The intent of the project was to utilize and enhance an existing master <br />plan. The updated master plan incorporated existing stormwater facilities <br />with a conceptual design in order to achieve a comprehensive system <br />that would improve the Town's flood protection. Due to the existing con- <br />ditions within the Town (Le., tidal influences and low topography) storm- <br />water pumps stations and water quality structures were implemented in <br />order to address the water quantity and quality of runoff prior to dis- <br />charge. <br /> <br />PROJECT NAME: <br />PROJECT ENTITY: <br /> <br />CONTACT NAME/NO: <br /> <br />PROJECT INITIATION: <br />PROJECT COMPLETION: <br /> <br />FALL 2001 <br />SPRING 2003 <br /> <br />() <br /> <br />Craig A. Smith & Associates <br />ENGINEERS e SURVEYORS. UTILITY LOCATORS e GRANTS ASSISTANCE <br /> <br />PP02-00 <br /> <br />ADMINIPROPOSALSfPROJECTPROFILESf059 <br />