My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Beiswenger, H & A
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
Beiswenger, H & A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 3:28:37 PM
Creation date
2/18/2011 3:28:37 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
p.e.
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />- <br />. <br />. <br />- <br />. <br />- <br />. <br />- <br />. <br />. <br />. <br />. <br />- <br />. <br />. <br />- <br />. <br />- <br />I. <br />. <br />I- <br />,- <br />I- <br /> <br />~) <br />l' ~ <br />,. . t ~~O~~~[N]@~~9 O=O(Q)~O=O ~[N][Q) ~~~(Q)~~~lF~~9 O[N]~c <br /> <br />2. A list of all projects (including government projects) <br /> <br />a. Reference Project Name/Address: City of Sunny Isles Beach, Florida <br /> <br />Reference Project Description: Central Island Drainage and Street Improvements <br /> <br />Scope of Services Provided: Value engineering of existing drainage design, evaluation of drainage <br />alternative, preliminary design final pavement rehabilitation and drainage <br />design using deep wells and technical assistance during bidding <br />process. <br /> <br />Project Start Date: Jan. 2004 Project Completion Date: Aug. 2007 <br /> <br />Estimated Construction Completion Date: October 2008 <br /> <br />Estimated $ 4.5 million <br /> <br />- <br />. <br />I <br />I <br />,- <br />.. <br /> <br />Professional Fees: $ 203,680.00 <br />Construction Start Date: July, 2007 <br />Project Construction Cost: <br />Reference Company Name: <br /> <br />City of Sunny Isles Beach, Rick Conner, 305-947-0606, Fax 305-792- <br />1564, email: rconner@sibf.net <br /> <br />Beiswenger, Hoch and Associates was invited to <br />evaluate a previously design stormwater drainage <br />system. BHA evaluated that system and upon an <br />environmental, feasibility and cost evaluation, <br />recommended for a new design using a series of <br />drainage wells interconnected for flow <br />equalization. The system recommended by BHA <br />eliminated direct outfalls to the ecological sensitive <br />Dumbfoundling Bay. <br /> <br /> <br />This drainage and street improvement project is <br />part of the Comprehensive Plan to alleviate <br />flooding problems throughout the City of Sunny <br />Isles Beach. BHA's approach to solve the flooding <br />problems of the Central Island neighborhood was <br />to utilize Drainage wells. <br /> <br />This drainage and street improvement project is <br />the first of its kind to utilize 22 Storm water <br />Drainage Wells for flood control. The injection <br />wells are modeled to equalize runoff injection to <br />the water table. <br /> <br />b. Reference Project Name/Address: <br />Reference Project Description: <br />Scope of Services Provided: <br /> <br />Professional Fees: $ 448,864.00 <br />Construction Start Date: 3/2002 <br />Project Construction Cost: <br />Reference Company Name: <br /> <br />City of Sunny Isles Beach, Florida <br />Golden Shores drainage and street improvements <br />Survey, street widening and revised preliminary and final design and <br />construction inspection. <br />Project Start Date: Nov.2000 Project Completion Date: Mar. 2003 <br />Construction Completion Date: Jan. 15, 2003 <br />$ 3,449,896.56 <br />City of Sunny Isles Beach, James Watts, 305-947-0606, Fax 305-792- <br />1564 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.