Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />- <br />. <br />. <br />- <br />. <br />- <br />. <br />- <br />. <br />. <br />. <br />. <br />- <br />. <br />. <br />- <br />. <br />- <br />I. <br />. <br />I- <br />,- <br />I- <br /> <br />~) <br />l' ~ <br />,. . t ~~O~~~[N]@~~9 O=O(Q)~O=O ~[N][Q) ~~~(Q)~~~lF~~9 O[N]~c <br /> <br />2. A list of all projects (including government projects) <br /> <br />a. Reference Project Name/Address: City of Sunny Isles Beach, Florida <br /> <br />Reference Project Description: Central Island Drainage and Street Improvements <br /> <br />Scope of Services Provided: Value engineering of existing drainage design, evaluation of drainage <br />alternative, preliminary design final pavement rehabilitation and drainage <br />design using deep wells and technical assistance during bidding <br />process. <br /> <br />Project Start Date: Jan. 2004 Project Completion Date: Aug. 2007 <br /> <br />Estimated Construction Completion Date: October 2008 <br /> <br />Estimated $ 4.5 million <br /> <br />- <br />. <br />I <br />I <br />,- <br />.. <br /> <br />Professional Fees: $ 203,680.00 <br />Construction Start Date: July, 2007 <br />Project Construction Cost: <br />Reference Company Name: <br /> <br />City of Sunny Isles Beach, Rick Conner, 305-947-0606, Fax 305-792- <br />1564, email: rconner@sibf.net <br /> <br />Beiswenger, Hoch and Associates was invited to <br />evaluate a previously design stormwater drainage <br />system. BHA evaluated that system and upon an <br />environmental, feasibility and cost evaluation, <br />recommended for a new design using a series of <br />drainage wells interconnected for flow <br />equalization. The system recommended by BHA <br />eliminated direct outfalls to the ecological sensitive <br />Dumbfoundling Bay. <br /> <br /> <br />This drainage and street improvement project is <br />part of the Comprehensive Plan to alleviate <br />flooding problems throughout the City of Sunny <br />Isles Beach. BHA's approach to solve the flooding <br />problems of the Central Island neighborhood was <br />to utilize Drainage wells. <br /> <br />This drainage and street improvement project is <br />the first of its kind to utilize 22 Storm water <br />Drainage Wells for flood control. The injection <br />wells are modeled to equalize runoff injection to <br />the water table. <br /> <br />b. Reference Project Name/Address: <br />Reference Project Description: <br />Scope of Services Provided: <br /> <br />Professional Fees: $ 448,864.00 <br />Construction Start Date: 3/2002 <br />Project Construction Cost: <br />Reference Company Name: <br /> <br />City of Sunny Isles Beach, Florida <br />Golden Shores drainage and street improvements <br />Survey, street widening and revised preliminary and final design and <br />construction inspection. <br />Project Start Date: Nov.2000 Project Completion Date: Mar. 2003 <br />Construction Completion Date: Jan. 15, 2003 <br />$ 3,449,896.56 <br />City of Sunny Isles Beach, James Watts, 305-947-0606, Fax 305-792- <br />1564 <br /> <br />2 <br />