My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EE&G
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
EE&G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 4:27:44 PM
Creation date
2/18/2011 4:17:49 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
P.E.
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EEb-G I <br /> <br />ENVIRONMENTAL ENGINEERING SERVICES 1 <br /> <br />. Collection of relative humidity, temperature, dew point, carbon dioxide, and carbon <br />monoxide. <br />. Water intrusion assessments. <br />. . Development of written assessment reports, and scope of works for abatement and <br />remediation. <br />. Abatement and remediation project coordination, oversight, and monitoring. <br />. Post-removal inspections and clearance sampling. <br /> <br />Brevard County School Board - Environmental/IAQ Services <br />Contact: Jim Powers <br />Address: 1254 South Florida Avenue, Rockledge, FL 32955 <br />Tel/Fax: (321) 633-3497/(321) 617-7756 <br />Date: January 1999-2004 <br /> <br />EE&G has provided asbestos consulting services for over 100 projects including the performance of <br />AHERA inspections, re-inspections and periodic inspections. EE&G provides consulting services in <br />connection with the complete renovation of the West Melbourne Elementary Schools, which involved <br />project design and monitoring during the removal of category I & II materials. <br /> <br />Radon Testing, including both Phase I and 1\ testing in 23 different schools. The project included the <br />collection of 300 radon samples over a one-month period. <br /> <br />Lead-based paint, EE&G conducted a limited risk assessment following the improper sandblasting of a <br />water tower adjacent to a school property. The work included the collection and analysis of surface <br />wipe samples. <br /> <br />'I. <br />, <br /> <br />Indoor Air Quality, EE&G has conducted numerous IAQ-related projects for the School District. One <br />such project, conducted at Satellite Beach High School, included evaluation of the heating ventilation <br />land air conditioning (HVAC) system to identify the cause of elevated humidity throughout the school. <br />The project also included the design of remedial actions and the collection of air data. <br /> <br />Removal of underground storage tanks at Normandy School, McNair Magnet School, L.B. Johnson <br />Middle School, and West Melbourne School of Science. EE&G completed Tank Closure Assessment <br />qeports (TCARs) with each of these projects. <br /> <br />'. Itial Remedial Actions (IRAs) including removal of petroleum-affected soils at McNair Magnet ~~hool, <br />1: emoval of petroleum-affected soils and free-floating product at West Melbo~rne School.. and addition of <br />_ ~ I compounds (ORCs) to enhance the natural attenuation of reSidual petroleum <br />')~~~~~ar~~~:sf~\I0Wing the tank removals. Quarterly woundwater qUalitYd m~nit~r~gl:t W~s~~~~~f <br /> <br />'~;o~i~~e;~~~~~, ~:~~S~f:~~~~~ R:~~rt~J~~~~~ ~I~~:~~a~o~~~,;;;s: Wh~~h w:reo~;pacted by <br /> <br />')Ieum hydrocarbons. <br /> <br />. . f b . d debris at Freedom 7 Elementary School. EE&G <br />Emergency r~sponse follOWing tt~~t.dISCOV~ryp~oVi~~~ engineering research and expertise to evaluate <br />conducted site assessment ac IVI les, ~n .' .. <br />options for handle the debris and associated dewatering activities. <br /> <br />\ <br />\ <br /> <br />,II <br /> <br />III <br /> <br />r- 13 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.