My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tim Haahs Engineers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Tim Haahs Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2011 3:50:47 PM
Creation date
2/28/2011 3:44:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park & Pkg Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'I <br />II <br />II <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />{Present as many projects as requested by the agency, or 10 projects, If not specified. <br />ComDfete one Section F for each DroiectJ <br />21. TITLE AND LOCATION (City and State) <br />MBNA Southern Regional Headquarters Parking Garage <br />Boca Raton, FL <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />3 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable) <br />1997 1997 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Homsey Architects, Inc. Don Homsey 302-656-4491 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />TimHaahs, the project team's Parking Consultant, was responsible for the functional design and structural engineering of the 499 <br />space employee Parking Garage for MBNA America's new Southern Regional Headquarters in Boca Raton, Florida, The project, <br />completed in the summer of 1997, also included construction of two office buildings, <br /> <br />II <br />,I <br />I <br /> <br />Measuring 188' x 178', the functional layout incorporates one-way traffic along the flat outer bays while using two-way traffic along <br />the center ramped bay for vertical circulation. The facility uses 9'-0" standard parking stalls and also includes 8'-0" compact parking <br />spaces. <br /> <br />I <br /> <br />The structural design uses a combination cast-in-place/precast Filigree concrete system that allowed for six levels matching the <br />adjacent office height <br /> <br />I <br /> <br />The architectural design by Homsey Architects of Wilmington, Delaware, blended the look of the parking facility with the adjacent <br />office buildings. This was accomplished by incorporating aluminum window grillwork in all of the garage openings and by including a <br />steel-supported concrete tile parapet wall along the entire roof of the facility. <br /> <br />The project was built on a fast-track design/construct schedule and was under the budget and on time for user occupancy. <br /> <br />I <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br /> <br />I <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />(1) FIRM NAME <br /> <br />Timothy Haahs & <br />Associates, Inc. <br /> <br />Blue Bell, PA <br /> <br />(3) ROLE <br />Structural Engineering; Parking Design and Consulting <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />STANDARD FORM 330 (1/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.