Laserfiche WebLink
<br />mayor may not as it is an interior street. The contractor coordinates it and the City <br />will pay for it. If you are going to obstruct the entrance on Collins and have lane <br />closures you may have to have Police, but we will meet with Robert Solera who is in <br />charge of traffic here. <br /> <br />54. A special time to perform work in that section there? <br />As quickly as possible, the quicker the better, the City does not have any set time but <br />you might want to do it at night to ~llleviate connections, etc. This is why you must <br />bring your MOT to DOT because we don't know how much you will need to encroach <br />in there. <br /> <br />55. What color for sidewalk? <br />No sidewalk there at all. <br /> <br />We would like to get feedback from you on how you envision this project going along, <br />opening and closing sections as you go, or gutting it out all at once. It is depending on <br />time constraints, it would be faster to gut it all out at once, but we don't want any holes. <br /> <br />56. In October there is high tide, would you consider another time, as the water is a foot higher <br />than it is now. <br />The Mayor, an ex-Commissioner, and a new Commissioner lives there, and we would <br />like to give them a realistic timeline. If you piecemeal it, it is going to take longer, but <br />if you tear it up all at once you may be able to do it faster. It is either or. <br /> <br />57. Will we get a copy of the sign-in sheets? <br />Yes, it will be part of the Addendum. It will be sent out in a couple of days. <br /> <br />The Pre-Bid Conference was concluded at 10:53 a.m. <br /> <br />08-06-01 Pre-Bid Conference QA <br /> <br />Page 7 of 7 <br />