My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chi-Ada Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-02) Janitorial Maint. Svcs,
>
Responses
>
Chi-Ada Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2011 4:37:27 PM
Creation date
3/10/2011 4:36:49 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Janitorial Maint. Svcs.
Bid No. (xx-xx-xx)
08-06-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Contractor to defend at its own expense or to provide for such defense, at City's option, any and all <br />claims of liability and all suits and actions of every name and description that may be brought against <br />City, excluding only those which allege that the injuries arose out of the sole negligence of City, which <br />may result from the operations and activities under this Contract whether the operations and activities be <br />performed by Contractor, its Sub-Contractors, or by anyone directly or indirectly employed by either. <br /> <br />4.20. City's Responsibility: The City will issue all communications to the Contractor; the City will <br />furnish the data required of them under the Contract Documents promptly; and the City's duties in <br />respect to providing lands and easements are set forth in this section. <br /> <br />4.21. Measurement of Quantities: All work completed under the Contract will be measured by the <br />City according to the United States Standard Measures. All linear surface measurements will be made <br />hOrizontally or vertically as required by the item measured. <br /> <br />4.22. Rejecting Defective Work: The City will have authority to disapprove or reject Work which is <br />"defective" (which term is hereinafter used to describe Work that is unsatisfactory, faulty or defective, or <br />does not conform to the requirements of the Contract Documents or does not meet the requirements of <br />any inspection, test or approval referred to in Special Condition, or has been damaged prior to final <br />acceptance). <br /> <br />4.23. Decisions on Disagreements: The City will be the initial interpreter of the Technical <br />Specifications. <br /> <br />4.24. Changes in Work: Without Invalidating the Agreement, the City may, at any time or from time <br />to time, order additions, deletions or revisions in the Work; these shall be authorized by Change Orders. <br />Upon receipt of a Change Order, the Contractor will proceed with the Work Involved. All such Work shall <br />be executed under the applicable conditions of the Contract Documents. If any Change Order causes an <br />increase or decrease in the Contract Price or an extension or shortening of the Contract lime, an <br />equitable adjustment will be made as provided in this document. A Change Order signed by the <br />Contractor indicates their agreement therewith. <br /> <br />4.24.1. The City may authorize minor changes or alterations in the Work not involving extra cost and not <br />inconsistent with the overall intent of the Contract Documents. These may be accomplished by a <br />Field Order. If the Contractor believes that any minor change or alteration authorized by the City <br />entitles them to an increase in the Contract Price or extension of Contract Time, they may make <br />a claim therefore as provided in this document. <br /> <br />4.24.2.Additional Work performed by the Contractor without authorization of a Change Order will not <br />entitle them to an increase in the Contract Price or an extension of the Contract lime, except in <br />the case of an emergency as provided in this document. <br /> <br />4.24.3. The City will execute appropriate Change Orders covering changes in the Work, to be performed <br />and Work performed in an emergency as provided in this section and any other claim of the <br />Contractor for a change in the Contract lime or the Contract Price which Is approved by the City. <br /> <br />4.24.4.It is the Contractor's responsibility to notify his Surety of any changes affecting the general scope <br />of the Work or change in the Contract Price or Contract lime and the amount of the applicable <br />bonds shall be adjusted accordingly. The Contractor will furnish proof of such an adjustment to <br />the City. <br /> <br />4.25. Change of Contract Price: The Contract Price constitutes the total compensation payable to <br />the Contractor for performing the Work. All duties, responsibilities and obligations assigned to or <br />undertaken by the Contractor shall be at their expense without changing the Contract Price. <br /> <br />PAGE 18 OF 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.