My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 08-07-01 Emergency Debris Clearing and Removal
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 4:55:48 PM
Creation date
3/11/2011 4:36:41 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Emergency Debris Clearing & Removal Operations
Bid No. (xx-xx-xx)
08-07-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />Part B - Hourly Prices <br /> <br />Equipment and labor Rates <br />Equipment Type Typical Hourly Hourly Total <br /> Clearing Equipment labor Hourly <br /> Crew Rate Rate Rate <br /> Makeup <br />Bobcat Loader <br />Bucket Truck <br />Chipper/Mulcher (8" throat) <br />Chipper/Mulcher (12" throat) <br />Crew Foreman w/Cell Phone and Pickup <br />Dump Truck, 18 CY-20 CY <br />Dump Truck, 21 CY-30 CY <br />Grader w/12' Blade <br />Hydraulic Excavator, 1.5 CY <br />Hydraulic Excavator, 2.5 CY <br />Knuckleboom Loader <br />Laborer w/Chain Saw <br />Laborer w/small tools, traffic control, flag person <br />Lowboy Trailer wffractor <br />Mobile Crane (Adequate for hanqinq limbs/leaninq trees) <br />Operations Manager w/Cell Phone and Pickup <br />Pickup Truck, 1/2 Ton <br />Traffic Control, Temporary Sinqle Lane Closure <br />Tree Climber s/Chainsaw <br />Wheel Loader, 2.5 CY, 950 or similar <br />Wheel Loader, 3.5 - 4.0 CY, 966 or similar <br />Wheel Loader, 4.5 CY, 980 or similar <br />Wheel Loader-Backhoe, 1.0 - 1.5 CY <br />Other - Please List <br /> <br />Notes: <br /> <br />Note 1. Total Time and Material Prices shall include all labor (operators, laborers, and supervisors), equipment and materials including but not limited <br />to: supplies, equipment maintenance, repairs, repair parts, fuels, lubricants, cellular phones, transportation, traffic control and housing, if required, <br />necessary to accomplish the project. <br /> <br />Note 2. Identify the EquipmentlPersonnel that constitute a Typical Clearing Crew in the column provided <br /> <br />The Contractor will provide (number) of crews dedicated to perform the Work within the first 24 <br />hours following Notice to Proceed. <br /> <br />The Contractor will provide (number) of crews dedicated to perform the Work within the first 48 <br />hours following Notice to Proceed. <br /> <br />45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.