Laserfiche WebLink
<br />o <br /> <br />o <br /> <br />o <br /> <br />Part B - Hourly Prices <br /> <br />Eaulpment and Labor Rates <br />Equipment Type Typical Hourly Hourly Total <br /> Clearing Equipment Labor Hourly <br /> Crew Rate Rate Rate <br /> MakeuD * <br />Bobcat Loader x 542.50 532.50 575.00 <br />Bucket Truck 5112.50 ~32.50 5145.00 <br />Chipper/Mulcher (S.1hroat) 5105.50 ~28.50 5134.00 <br />ChiDDerlMulcher (12. throat) 5146.50 ~28.50 5175.00 <br />Crew Foreman wIGen Phone and Pickup x 59.00 s50.00 $59.00 <br />Dump Truck, 1S CY.20 CY x 541.50 s28.50 $70.00 <br />DumDTruc~21CY~OCY 552.50 s28.50 $81. 00 <br />Grader w/12' Blade 594.00 535.00 $129.00 <br />Hvdraulic Excavator, 1.5 CY 589.00 535.00 $124.00 <br />Hvdraulic Excavator, 2.5 CY 5105.00 s35.00 $140.00 <br />Knuckleboom Loader x S110.00 ~35.00 $145.00 <br />Laborer w/Chain Saw x S5.00 ~33.00 $38.00 <br />Laborer wIsman tools, traffic control, flag person x 52.50 s27.50 $30.00 <br />Lowboy Trailer wlTractor 568.50 528.50 597.00 <br />Mobile Crane (Adeauate for hanalna Iimbslleanina trees) 5175.00 Sit; 00 5210.00 <br />Operations Manaaer w/Cen Phone and Pickuo 59.00 (:ln1 nn 5110.00 <br />Pickuo Truck, 1/2 Ton 56.50 (:n nn 56.50 <br />TraffIC Control, Temoorary Sin!!le Lane Closure (:139.50 (:Rt; t;n 5225.00 <br />Tree Climber s/Chainsaw (:35.00 (:t;n nn 585.00 <br />Wheel Loader, 2.5 CY, 950 or similar x ~96. 50 (:":l? t;n 5129 00 <br />Wheel Loader, 3.5 - 4.0 CY, 966 or similar (:118.50 (:":l? t;n 51S1 00 <br />Wheel Loader, 4.5 CY, 980 or similar $139.50 532.50 $172 . 00 <br />Wheel Loader-Backhoe, 1.0 - 1.5 CY $45.50 532.50 $78.00 <br />Other - Please Ust (Please see attached S hedule 2a and 2b) . <br />* Please see Schedule 2a for antici] ated Clear . ng Crew Me keups. <br /> <br />Notn: <br /> <br />NotI1. Total TlIIII and Ma18r1al Prlcel ahaIllncIudI a1I!abor (optl'lltorl, !aborarl, Ind lupervlaora), equipment and materials including but not limited <br />to: luppllea, equipment malnlBnance,l8paJra, I8pIIr perla, luell, lubricants, cellular phonu, lranlportallon. tra1fk: control and haUling, If required, <br />neceaaary to accomplish the project. <br /> <br />Nom 2. ldenllty the EqulpmentlPerllOnnel that constltuta a TypIcal Clearing Craw In tha column provided <br /> <br />The Contractor will provide 25 (number) of crews dedicated to perform the Work within the first 24 <br />hours following Notice to Proceed. <br /> <br />The Contractor will provide 75 (number) of crews dedicated to perform the Work within the first 48 <br />hours following Notice to Proceed. <br /> <br />45 <br /> <br />Ash Britt. Inc. I Sunny Isles Beach. FL I RFP No. 08-07-01 <br />