<br />AshBritt, Inc. Disaster Response & Recovery Divisions
<br />Katrina MS Debris Mission, Select Project Statistics Table (2005-06)
<br />
<br />Oote: AshBritt responded to 16 separate jurisdictions in Mississippi as part of our USACE debris mission. Thefollowing tables delineate the major
<br />operational statitistics of9 of our mission task orders. Each task was managed as a separate project with a dedicated management structure. All
<br />were under the umbrella of mission-wide centralized Operation Management structure. following established standard operating procedures to
<br />ensure consistency and coordination of efforts. As the mission was carried out, resources were shared to maintain efficiencies and maximum
<br />productivity under the circumstances.
<br />
<br />Project Breakdowns
<br />
<br />ICategory Forrest Recovery George Recovery Hancock Recovery I
<br />Total Trucks (ROW) 1,737 308 4,041
<br />Total Trucks (Outhaul) 196 63 278
<br />Total ROW Collection (CY) 2,507,559 651,946 5,791,801
<br />Total Debris Disposal (CY) 946,243 241,449 1,617,214
<br />Total Temporary Debris Sites 7 2 6
<br />Total Hazardous Hanging Limbs 28,970 55,861 76,340
<br />Total Hazardous Leaning Trees 17,812 15,381 74,200
<br />Total Hazardous Stumps 3,889 1,265 6,899
<br />Total Holes Backfilled 7,513 3,478 6,026
<br />Total ROEs Performed 3,796 1,689 7,639
<br />
<br />Project Breakdowns
<br />
<br />o
<br />
<br />,Category Jackson Recovery Jones Recovery Lamar Recovery I
<br />Total Trucks (ROW) 1,880 1,373 1,137
<br />Total Trucks (Outhaul) 134 208 90
<br />,otal ROW Collection (CY) 3,195,031 1,963,938 1,542,307
<br />Jotal Debris Disposal (CY) 720,329 585,999 614,634
<br />Total Temporary Debris Sites 6 4 6
<br />Total Hazardous Hanging Limbs 63,520 401 30,069
<br />Total Hazardous Leaning Trees 22,003 16 19,319
<br />Total Hazardous Stumps 2,631 0 2,737
<br />Total Holes Backfilled 10,238 0 5,518
<br />Total ROEs P~rformed 4,757 25 2,335
<br />
<br />Project Breakdowns
<br />
<br />iCategory Pascagoula Recovery Pass Christian Recovery Walthall Recovery I
<br />Total Trucks (ROW) 446 748 260
<br />Total Trucks (Outhaul) 77 14 45
<br />Total ROW Collection (CY) 1,238,626 1,489,971 508,226
<br />Total Debris Disposal (CY) 259,341 716,708 190,560
<br />Total Temporary Debris Sites 5 6 2
<br />Total Hazardous Hanging Limbs 0 12,831 33,018
<br />Total Hazardous Leaning Trees 0 15,905 10,146
<br />Total Hazardous Stumps 0 1,494 2,209
<br />Total Holes Backfilled 0 875 3,571
<br />Total ROEs Performed 0 3,083 3