Laserfiche WebLink
<br />Ash Britt, Inc. Disaster Response & Recovery Divisions <br />AshBritt, Inc. General Templatefor Initial Mobilization & Response Plan Table <br /> <br />Purpose. The function of this Initial Mobilization/Response Plan Template is to provide a general timeline and direction, guidance and reference for the critical actions <br />and requirements of our disaster response mobilization. The Plan represents a general guidline of the "muster" and mobilization actions that occur in response to a <br />C-edictable" event. <br />!idance. The guidance for this Initial Mobilization/Response Plan is consistent with the excigency to respond to an adverse emergency situation. It details the <br />specific assignments for Ash Britt management and other response personnel as it relates to the recovery effort. <br />Assumptions. It is assumed that all contracted work or special taskings will be issued by the City OM. It is also assumed that the obligations of key City and/or federal <br />agencies will be carried out as per the City Debris Management Plan and/or the Stafford Act. Furthermore, it is assumed that this mobilization plan does not include <br />actions reserved for or conducted by any unit of government. <br />Range. The Initial Mobilization/Response Plan incorporates those projected activities from a period three days prior to landfall until deployment and activation of <br />debris collection crews to the City five days from the event. <br /> <br />Pre/Post Event Activity or Plan Execution Responsible Party Subs (%) Equip. <br />Days Hours Qty.* <br /> Initiate the City contact at the Administration level. Discuss plan overview, identifY and confirm AshBritt Principal, Chief <br />-3 0 contact information for the City Recovery Management Team, establish reporting and <br /> coordinating schedule. Operating Ofticer (COO) <br />-3 0 NotifY potential First Responders to begin preparation for activation. COO <br />-2 0 Initiate the City contact at the Management level. Discuss plan details and confinn COO <br />responsibilities. Confirm local "rally point" for inbound vehicles and equipment. <br />-2 0 Organize AshBritt First Responder Teams. Instruct teams to prepare for immediate deployment. COO <br />-2 0 Establish "hold points" 100 to 150 miles from the City out of the storm path where personnel COO <br />and equipment can be staged. <br />-2 0 Inventory and distribute as needed: satellite phones, Nextels, cell phones, laptops, GPS units, Project Manager (PM) <br />cameras. safety supplies, badges, and other individual support equipment. <br />-2 0 Inspect and prepare equipment for transport, order permits as necessary. Equipment Manager (EM) <br />-I 0 Deploy First Responder personnel and equipment to the "hold point". COO <br />-1 0 Arrange for local post-event crew lodging or activate temporary housing provider. Activate local Support Manager (SM) <br />service and supply accounts. <br />-I 0 Place "on hold" orders for oftice trailers, generators, scissor lifts, scaffolding, and other SM <br />proiected needs. <br />-0 18 Initiate 18 hour update for the City, First Responders, Staff. PM <br />C '-0 12 Initiate 12 hour update for the City, First Responders, Staff. PM <br />~-O 6 Initiate update 6 hour for the City, First Responders, Staff. PM <br />0 0 Maintain contact with the City. Receive available updates. Discuss preliminary damage reports. COO <br />+0 6 Deploy Ash Britt Management Team to the City. COO <br />+0 6 Deploy personnel and equipment from "hold points" to pre-detennined "rally point" within the PM 20% 15 <br />City. <br />+0 12 Execute Notice to Proceed work authorization: the City/ Ash Britt. COO, City Administration <br />+0 12 Receive from the City a list of immediate life support needs to be supplied (ice, water, power City Representative (CR) <br />I generation, othert <br /> Begin equipment certification at the rally point to include: Load volume certification, safety <br />+0 12 inspection and compliance, truck numbering, insurance certification, and digital photos of all PM, EM, CR <br /> trucks and eauipment. <br />+0 12 Assist with preliminary damage assessment to determine quantity and composition of recovery COO, PM, CR <br />resources needed. <br />+0 12 Deploy emergency clearance crews as directed by the City staff. PM,CR 30% 23 <br />+0 12 Assess damage to Temporary Debris Storage and Reduction Site (TDCRS) sites. Confinn PM,CR <br />TDCRS site selection and post-stonn viability. <br />+1 0 Approve site plans for development ofTDCRS sites. PM,CR <br />+1 0 Begin base line testing and development ofTDCRS sites. Open for debris delivery as soon as Disposal Site Mgr (DSM) <br />I possible, minimallv 24 hours. <br />+1 0 Establish the City collection zones for crew assignment. PM,CR 40% 30 <br />+2 0 Collection crew meeting. Set debris collection parameters for project, truck routes, TDCRS site COO, PM, CR <br />status, reporting structure, quality control standards, safety concerns, chain of command. <br />+2 0 Assign Collection crews to zones. Begin debris collection. PM,CR 60% 45 <br />+2 0 Deploy the City debris monitors, and the City tower monitors. CR <br />+2 0 Deploy Quality Control Coordinators. Commence quality assurance and compliance program to Qual ity Assurance <br />identifY, track and correct deficiencies. Manager (QAM) <br />+3 0 Push continued; ROW collection ramp-up with emphasis on assessment priorities; TDCRS(s) PM,CR 80% 60 <br />operations fine-tuned. <br />V 0 Priorty emergency push completed; Full mobiliaztion of resources; Continue ROW collection PM, CR, et al. 100% 75 <br />efforts; Begin Hazardous and Stump assesment removal. <br />+5 0 Continual assessment, planning and progress; add additional resources as necessary. PM, CR, et al. <br /> <br />"Note: Approximation of total equipment units for a Category 4 debris generating event (Equipment will vary by type and hauling capacity). AshBritt will only use rubber-tired, self- <br />loading and unloading trucks for cleanup efforts within the borders of the City; only the size (capacity) of utilized self-loading vehicles will vary based on the area of deployment <br />within the City. <br /> <br />AshBntt. Inc. I Sunny Isles Beach, FL I RFP No. 08-07-01 <br /> <br />36 <br />