Laserfiche WebLink
<br />o <br /> <br />o <br /> <br />o <br /> <br />another designated area prior to completion of work and to receiving authorization. We will not enter onto private <br />property during performance of this contract prior to receipt of an executed right-of-entry (ROE). <br /> <br />. Temporary Debris Stagillg alld Reductioll <br />All activities associated with massive debris clearance, removal, and ultimate disposal operations depend upon the <br />availability of suitable temporary debris staging and reduction sites (TOSRS). Identifying these potential sites before a <br />natural disaster will expedite and facilitate debris removal and subsequent volume reduction and disposal activities. If <br />sites are not yet identified, an experienced Ash Britt representative will assist the City in the identification and selection <br />of potential TOSRS. <br /> <br />In congested urban areas where large, prototypical sites are unavailable, the use of multiple TOSRS, twenty-four hour <br />operations, and immediate removal of separated and processed debris can help alleviate the constraints of smaller <br />temporary disposal sites. Ash Britt has proven success in establishing and managing single large and multiple small <br />disposal sites. <br /> <br />. Baseline Data. Prior to site preparation and activation, AshBritt will assist in establishing baseline data to document <br />a site's pre-use condition. This entails taking ground or aerial video or photographs, noting important structures, fences, <br />culverts and landscaping, analyzing random soil samples and ground water samples. We will evaluate the topography <br />and soil/substrate conditions to determine the best layout for site activities. And we will attempt to limit the <br />modification of the site in order to minimize site closure and restoration costs. Moreover, as part of our initial site <br />assessment we will contemplate environmental factors such as noise, dust, smoke, erosion control, storm water runoff, <br />wetlands, historic preservation, endangered species, and traffic and safety controls. <br /> <br />. Site Plan. AshBritt will establish and submit for approval a site plan and operating procedures for the TOSRS. The <br />plan and operating procedures will include: site preparation, including any clearing, grading, and erosion control; <br />identification of ingress and egress; interior road system design, utilizing any existing roads; traffic flow and control; a <br />roofed inspection tower, sufficient for a minimum of three inspectors to monitor incoming and outgoing loads; site <br />layout and debris segregation plan, including separate benned containment areas lined with impermeable material for <br />the storage of HHW, ash, and fuel, "clean" debris area for woody debris and burnable C&O awaiting reduction, storage <br />areas for metals and white goods, storage area for non-burnable debris awaiting transfer to final disposal, debris <br />reduction area with appropriate set backs and safety zones for the type of reduction (burning or grinding); appropriate <br />signs, cones, safety barriers and caution tape identifying safety zones; a first aid station; site security and fire prevention <br />measures; activation date/time and daily hours of operation, and site management team with 24 hour contact numbers. <br /> <br />. Debris Reduction. AshBritt can provide several debris reduction options. These include air curtain incineration and <br />reduction by grinding. We consider logistical and environmental concerns, as well as the potential disposal outlets <br />when deciding. For the City, reduction by grinding would be our recommended method. This involves using industrial <br />tub or horizontal feed grinders powered by up to 1 000 hp diesel engines. A grinder will process up to 400 cubic yards of <br />clean woody debris per hour, reducing the volume by approximately 4 to I. <br /> <br />· Maintenance. AshBritt will maintain the TOSRS as necessary to ensure safety and minimize environmental impact. <br />Normal maintenance will include: adding rock to roads for stabilization, modifying road system as needed, installing silt <br />fences or berm systems to divert rainwater and protect areas from runoff and loss of topsoil, replace liners under <br />stationary equipment, document and rectify any accidents, spills, or environmental mishaps that occur. Additionally, <br />we will supply site security and appropriate fire prevention measures when necessary. <br /> <br />· Site Closeout & Restoration. Each TOSRS will eventually be cleared of all debris and restored to its pre-disaster <br />condition and use. AshBritt will test soil and ground water to compare to the pre-disaster baseline, verifying that no <br />long-term environmental contamination is present. Our basic closeout steps are: remove all debris, stored material, and <br />unnecessary equipment from the site; conduct an environmental assessment; develop a restoration plan; submit for <br />review and approval by the COM; execute the approved plan; obtain acceptance from the COM and execute the site <br />closure documents. Closeout and restoration is generally completed within 30 days of receiving the last load of <br />incoming debris. <br /> <br />. Debris Disposal <br />All debris collected by AshBritt during disaster recovery activities for the City will be disposed of in accordance with <br />all applicable state, federal and local laws, codes, standards, and regulations. A description of the most common types of <br />debris generated in recovery operations and the anticipated disposal method are detailed as follows. <br /> <br />. <br /> <br />Mulchfrom woody debris reduced by grinding - Potential beneficial uses include utilization as a fuel for <br /> <br />AshBritl. Inc. I Sunny Isles Beach, FL I RFP No. 08-07-01 <br /> <br />57 <br />